Similar Projects
Last Updated | 09/18/2023 08:02 AM |
Project Title | Pool Re-Plastering |
Physical Address | View project details and contacts |
City, State (County) | Central, SC 29630 (Pickens County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Site Development, Swimming Pool(s) |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $170,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Central Clemson Indoor Recreation Center is requesting sealed proposals from qualified firms or individuals for lap and small pool re-plastering. Question Deadline 09/25/2023 at 5:00 PM ET SPECIFICATIONS/SCOPE OF WORK The successful Proposer shall provide the following: Small Pool o Remove and replace (2) 12" band of black 2"x2" racing lanes and wall targets. o Clean existing plaster surface, acid wash and pressure wash with turbo tip, prior to bond coat application. Existing plaster surface may require water blasting to support bonding agent. o Cut and chip plaster beneath waterline tile, to create spacing for new plaster application. o Saw cut and chip away existing plaster around all return lines, rope anchors for a better transition of new plaster. o Sound out existing plaster. Beat up and remove loose plaster. o Apply a bond coat, Muticoat Products', Scratch Kote 2000 to ensure that new plaster will adhere to existing plaster. o Supply and install one row of 2" x 2" black tile trim on steps and benches. o Supply and install (2) new 12" main drain frame and grates for main drains, (3) 8" frame and grate for EQ lines under skimmers. Supply and install (23) 1 1/2 " screw on eyeball return fittings for return lines. o Apply approx. 3/8" to 1/2 " average, white plaster, trowelled to a hard smooth finish. o Remove and replace waterline tile around pool, including depth markers and International NO DIVING tiles. Apply a taped and tooled polyurethane between new tile and existing coping. Lap Pool o Remove and replace (6) 12" band of black 2"x2" racing lanes and wall targets. o Clean existing plaster surface, acid wash and pressure wash with turbo tip, prior to bond coat application. Existing plaster surface may require water blasting to support bonding agent. o Cut and chip plaster beneath waterline tile, to create spacing for new plaster application. o Saw cut and chip away existing plaster around all return lines, rope anchors, and wall steps for a better transition of new plaster. o Sound out existing plaster. Beat up and remove loose plaster. o Apply a bond coat, Muticoat Products', Scratch Kote 2000 to ensure that new plaster will adhere to existing plaster. o Supply and set two rows of black 2"x2" belly band across middle of pool, to differentiate shallow end and deep end. o Supply and install (2) new 12" main drain frame and grates for main drains, (9) 8" frame and grate for EQ lines under skimmers. Supply and install (28) 1 1/2 " screw on eyeball return fittings for return lines. Repair pool light covers. o Apply approx. 3/8" to 1/2 " average, white plaster, trowelled to a hard smooth finish. o Remove and replace waterline tile around pool, including depth markers and International NO DIVING tiles. Apply a taped and tooled polyurethane between new tile and existing coping Proposer shall provide an itemized pricing schedule that includes the following: o Removal and replacement |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |