Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Veterans Square Streetscape Improvement Project
Infrastructure
Post-Bid
Bradford, PA 16701

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Group 2-21-St5
Results
$2,500,000 to $4,999,999 est. value

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

2021 Road Improvement Project
Results

Milling of Bituminous Paving Notch
Infrastructure
Post-Bid
Turtlepoint, PA

US Route 6 Port Allegany Betterment
Results
$1,000,000 to $2,499,999 est. value
Port Allegany, PA

23 NC SGL 62 Barney Brook Road Improvement
Infrastructure
Post-Bid
PA

Group 2-21-St52
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

Bradford Bypass
Renovation, Infrastructure
Post-Bid
$5,000,000 to $7,499,999 est. value
Bradford, PA 16701

NC Road Improvement Project SGL 62
Infrastructure
Results
PA

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Mount Jewett Route 6 Enhancements
Infrastructure
Results
$500,000 to $999,999 est. value
PA

Reported 05/04/2022 12:00 AM
Project Title

T-362 West Valley Road Improvements Project Phase 1 and Phase 2

Physical Address View project details and contacts
City, State (County) Smethport, PA   (McKean County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The T-362 West Valley Road Improvements Project includes increasing the damaged cartway width back to 18 ft. using Full Depth Reclamation paving methods which will also improve drainage conditions by re-establishing positive drainage through the 6.5 mile length. Traffic safety features and traffic control will also be included.A pre-bid conference will not be held for this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents