Similar Projects
STEM Lab & Administration Center
Renovation
Bidding
Matteson, IL 60443

Life Safety Improvements
Renovation
Bidding
Highland Park, IL

New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Harvard High School 2021 Improvements - Bid Release 2
Bidding
Harvard, IL 60033

2021 Summer Renovations at West Oak Campus and Diamond Lake School
Renovation
Post-Bid
Mundelein, IL 60060

Argo G Bldg Second Floor Toilet Renovation
Renovation
Results
Summit, IL 60501

2021 Asbetos and Lead Removal Work Associated with Planned Bathroom Renovation at Fremd High School and Palatine High School Facilities
Renovation
Bidding
Palatine, IL 60074

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Addison School District 4 - 2021 Capital Improvements
Renovation
Results
Less than $3,800,000 est. value
Addison, IL 60101

CPS Agassiz, Goethe, Salazar & Wells ADA Modifications
Bidding
Chicago, IL 60657

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Reported 04/13/2021 12:00 AM
Project Title

Edison Middle School - South Stair Repair

Physical Address View project details and contacts
City, State (County) Champaign, IL 61820   (Champaign County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project includes the renovation and repair of the South Entry Stairs facing Green Street. The existing South Entry Stairs are original to the building constructed around 1914. The existing masonry foundations currently supporting the granite treads are failing and will be replaced by concrete footings on existing foundations (and other work).

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Maintenance of Masonry, Maintenance of Unit Masonry, Unit Masonry Cleaning, Unit Masonry Restoration.
Division 05 - Metals, Metal Railings, Pipe and Tube Railings.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents