Similar Projects
Air Compressor for City of Taylor DPW
Term Contract
Sub-Bidding
Taylor, MI 48180

Retention Treatment Basin Effluent Channel Flap Gate Project
Demolition, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Wyandotte, MI 48192

Lead Abatement / Minor Repair Services
Term Contract
Post-Bid
Detroit, MI 48226

Port Street Vactor Pad and Grading/Plymouth Twp Pond
Infrastructure
Post-Bid
$400,000 CJ est. value
Plymouth, MI 48170

Asbestos Abatement at Cambridge HS Prior to Renovations
Alteration
Results
Garden City, MI 48135

Asbestos Abatement At Edison, Hamilton & Schweitzer Elementary School
Alteration
Results
Westland, MI

Asbestos Abatement
Alteration
Post-Bid
$80,000 est. value
Detroit, MI 48234

Asbestos Abatement at Cooper Upper Elementary School
Alteration
Results
$150,000 est. value
Westland, MI 48185

Abatement and Demolition of Commercial Structures
Demolition, Infrastructure
Post-Bid
$20,000 est. value
Detroit, MI 48204

MSP Northville Forensic Lab Shooting Range - Lead Abatment
Alteration
Results
$40,000 est. value
Northville, MI 48167

Statewide Abatement and Remediation Services- Asbestos, Lead, and Mold
Alteration
Post-Bid

House Demolition - 41321 Llewelyn Drive
Demolition, Infrastructure - 4,841 SF
Results
$65,250 CJ est. value
Northville, MI 48167

RFQ Contractor - Proposal N for Neighborhoods - Demolition
Demolition, Infrastructure
Post-Bid
$40,000 CJ est. value
Detroit, MI 48226

Detroit Land Bank Authority Renovation Project Manual
Renovation
Results
$1,800 CJ est. value
Detroit, MI 48214

Asbestos Abatement at Innovation Center
Alteration
Post-Bid
$32,000 est. value
Detroit, MI 48239

Reported 09/22/2023 12:00 AM
Project Title

RFP Design - Milliken State Park - Dry Dock Erosion

Physical Address View project details and contacts
City, State (County) Detroit, MI 48207   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Bidding, Accepting Qualifications, Construction Start Expected 2024,
Bids Due View project details and contacts
Estimated Value $179,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov . The email Subject must include (facility name, project name, date and time of Pre-Proposal Walk Through Meeting). The Department of Technology, Management and Budget (DTMB), in partnering with the Department of Natural Resources (DNR) is seeking proposals for Phase 100 Study to investigate the causes and remedies for the concrete sea wall at the east side of historic dry dock leaning outwards and causing erosion under the sidewalk along the seawall of the dry dock. DTMB is requesting that professionals provide cost estimates for the construction remedy and include professional costs for Phases 200 - 700. Please note, the recommended firm will likely only be awarded Phase 100 services. If you experience issues or have questions regarding your electronic submission, you must contact assistance prior to the 2:00 p.m., solicitation deadline. You may contact by telephone at 517.284.0540 or toll-free at 888.734.9749. Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov). You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. Please do not submit questions Electronically. ALL questions should be emailed to Bahjetc@Michigan.gov no later than 2:00 p.m., Eastern on Monday, September 11, 2023 The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents