Similar Projects
Fort Peck Power House 1 Draft Tube Stoplog Replacement
Infrastructure
Design
$1,000,000 CJ est. value
Fort Peck, MT 59248

Glasgow Pool - Rebid
New Construction, Infrastructure, Renovation - 2,856 SF
Bidding
$2,960,000 CJ est. value
Glasgow, MT 59230

Frazer Community Building
Renovation, Infrastructure
Bidding
$414,000 CJ est. value
Frazer, MT 59225

Charles M Russell Refuge Repairs
Renovation
Post-Bid
Glasgow, MT

Railroad Alley Sewer Separation
Infrastructure
Post-Bid
$600,000 CJ est. value
Glasgow, MT 59230

GAOA Grub Dam Rehabilitation
Renovation
Results
$1,000,000 to $5,000,000 est. value
Glasgow, MT 59230

Action for Eastern Montana Glasgow Head Start Facility
Infrastructure
Results
$380,573 CJ est. value
Glasgow, KY 42141

Demolition of the Frazer Community Hall
Demolition, Infrastructure
Post-Bid
$60,000 CJ est. value
Frazer, MT 59225

BLM, NCMD, Glasgow Field Office, Valley County Reservoirs Repair and Reclaim 2022
Renovation
Results
$100,000 to $250,000 est. value
Glasgow, MT 59230

Construction of Frazer Community Hall Foundation Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Frazer, MT 59225

Opheim Branchlines Project - Phase 1A
Infrastructure
Results
$5,375,977 CJ est. value
Opheim, MT 59250

Last Updated 04/09/2023 11:01 PM
Project Title

Fort Peck Toe Drain Outfall Repair and Monitoring System

Physical Address View project details and contacts
City, State (County) Fort Peck, MT 59223   (Valley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,624,847 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

FORT PECK DAM TOE DRAIN OUTFALL REPAIR AND MONITORING, FT. PECK MONTANA This solicitation and resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. In addition, this soliciation portion is the Step-One, which is a request for technical proposals only. Bid Bonds are not required to be submitted with the Step-One technical proposal. This solicitation is for 100% Small Business Set Aside. Offerors shall only submit one (1) question per inquiry. All inquiries containing multiple questions may be rejected. Please review all previous inquiries to limit redundant inquiries. The Project ID is: FP85 Project Name: Toe Drain Outfall Repair and Monitoring System Bidder Inquiry Key: AE75GB-IPD8S6

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents