Similar Projects
Violet Road
Infrastructure
Bidding
$3,000,000 est. value
MS

Micro-Surfacing Project
Infrastructure
Bidding
$300,000 est. value
Quitman, MS

2021 Overlay Petal
Post-Bid
Petal, MS

Construction of 0.046 Miles of Precast Concrete Spans with Paved Approaches on The Bethel Church Road
Post-Bid
De Kalb, MS 39328

Mill and Overlay
Results
MS

Mill, Overlay and Stripe Approximately 2 Miles on I-69 from the Concrete Section to Tennessee State Line
Results
MS

Mill and Overlay
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Crystal Springs, MS

Fraternity Row Paving Project
Post-Bid
University, MS

Overlay
Results

Mill and Overlay of US 51
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Winona, MS 38967

Barnes Road Overlay and Striping Project
Infrastructure
Post-Bid
Carthage, MS 39051

Overlay Approximately 6.5 Miles on US 61 from the Warren County Line to the Sharkey County Line
Results
MS

Overlay Approximately 6 Miles of US 11
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value

Popp’s Ferry Road Relocation Phase IV Improvements Project
Infrastructure
Post-Bid
$3,000,000 to $3,500,000 est. value
D'Iberville, MS

Mill and Overlay Approximately 8 Miles on SR 41 from SR 32 to the Pontotoc County Line
Results
MS

Last Updated 05/11/2022 11:56 PM
Project Title

Air Park Road Scrub Seal

Physical Address View project details and contacts
City, State (County) Tupelo, MS 38801   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the placement of a scrub seal surface treatment base layer on local roadways within the City of Tupelo as defined in the Contract Documents. The existing asphalt pavement will be cold milled by others in preparation for the placement of the scrub seal application to be installed by the contractor per the technical specifications. The base bid will include the work as defined for approximately 165,000 SF of existing roadway on Air Park Road from W. Main St. to W. Jackson St. In addition, Alternate No. 1 is proposed to include the work as defined for approximately 49,000 SF of existing roadway on Holly Hill Dr. from W. Jackson St. to Redbud Ln. The Project shall make provisions for all labor, materials, equipment and incidentals required to provide the improvements as defined in the Proposal document and as represented in the General Conditions of Work and Technical Specifications as set forth in the Contract Documents. All proposed improvements are/shall be located within existing property / rights-of-way owned and maintained by the City of Tupelo

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents