Similar Projects
Z--PEVI 200745 - Restore North and South Seawalls at Perry's Victory to Safeguard Site
New Construction, Term Contract
Design
$10,000,000 est. value
Put-in-Bay, OH 43456

Willowbend Pump Station Improvements
Renovation
Bidding
$2,500,000 est. value
Bowling Green, OH

Habitat and Summit Med Lift Station and Force Main Replacement
New Construction, Infrastructure
Bidding
$2,500,000 est. value
Dayton, OH 45449

Blue Fountain Lift Station Pump Replacement
Post-Bid
Gallipolis, OH 45631

Rickenbacker Logistics Park Public Infrastructure
Post-Bid
Ashville, OH 43103

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

7th Street Sanitary Sewer Pump Station and Forcemain Project
Results
Waverly, OH

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Miller Road Booster Station Improvements
New Construction
Bidding
$271,390 est. value
Avon, OH 44011

Buckeye Water District Raw Water Pump Station Improvements "Contract A" - Site, Pumps, Building "Contract B" - Electrical
Post-Bid
Wellsville, OH 43968

Tivision Place Pump Station Replacement
Results
Ashtabula, OH 44004

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Small Pump Station Improvements
Post-Bid
Less than $800,000 est. value
Miamisburg, OH

Franklin Street and Industrial Drive Pump Station Renovations
Results
Less than $614,000 est. value
Van Wert, OH

Last Updated 11/08/2021 05:11 PM
Project Title

Pump Station Construction

Physical Address View project details and contacts
City, State (County) Middletown, OH   (Butler County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Schematic Drawings
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Capture the filter backwash and pump it into the sanitary sewer to reduce the burden on the nearby lime lagoon.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents