Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

Basketball Court Paving
Infrastructure
Bidding
WI

Road Work Bid
Infrastructure
Post-Bid
Forest, WI

Parks Paving, Sealing and Striping
Infrastructure
Post-Bid
New Richmond, WI 54017

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

River Falls - Spring Valley, CTH CC South to STH 128; River Falls - Spring Valley, Eau Galle River Bridge, B-47-0775
Results
River Falls, Spring Valley, WI 54022

2022 Road Improvements
Infrastructure
Post-Bid
WI

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Various Construction Season Materials/Services
Infrastructure
Post-Bid
Baldwin, WI

Glenwood City - Colfax, STH 128 to STH 79, Glenwood City - Colfax, STH 25 to CTH D, Glenwood City - Colfax, STH 79 to STH 25
Results
Colfax, Glenwood City, WI 54013

Blue Spruce Lane Improvements
Infrastructure
Post-Bid
Somerset, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Hammond, WI

Perch Lake Road Improvements
Results
Hudson, WI 54016

250th Street Reconstruction
New Construction
Results
Glenwood City, Hudson, WI 54013

Last Updated 03/14/2022 02:29 AM
Project Title

Houlton - STH 65, 14th Street to CTH V

Physical Address View project details and contacts
City, State (County) WI   (Saint Croix County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

St. Croix County; 8939-08-76, WISC 2022 264; CTH E; 2.005 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Beam Guard, Pavement Marking, Signs, and Culvert Pipes Excavation Common, 18,340 CY; Subbase, 19,500 Ton; Base Aggregate Dense, 13,780 Ton; LF; Marking Epoxy, 15,950 LF; Construction Staking, 54,720 LF; Construction Staking, 8 Each; Construction Staking, 1 LS; Culvert Pipe, 28 LF 15”, 432 LF 18”, 298 LF 24”; Concrete Curb and Gutter, 770 LF; Beam Guard, 846 LF; Beam Guard Energy Absorbing Terminals, 2 Each; HMA Pavement, 8,730 Ton; Tack Coat, 3,120 Gals; Signs, 311 SF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents