Similar Projects
RFQ D/B - New Dry Storage Building
New Construction, Infrastructure
Design
$260,000 CJ est. value
Nampa, ID 83687

Laguna Apartments
New Construction, Infrastructure - 9,714 SF
Design
$17,250,000 CJ est. value
Nampa, ID 83651

RFQ D/B - Health and Science and Horticulture Building, College of Western Idaho
New Construction, Infrastructure
Bidding
$48,000,000 CJ est. value
Nampa, ID 83687

2022, Ustick Road Widening, Ashton Avenue to I-84
Infrastructure
Post-Bid
$260,000 CJ est. value
Caldwell, ID 83687

Canyon Village Apartments / Caldwell
New Construction, Infrastructure - 13,866 SF
Post-Bid
$100,000,000 CJ est. value
Caldwell, ID 83607

Construction of Approximately 1100 feet of 8-inch Potable Water Line
Infrastructure
Results
$235,000 est. value
Nampa, ID 83687

Waterworks Materials Restock
Infrastructure
Results
Nampa, ID

Sonata Pointe West Townhomes - Phase 2
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Nampa, ID 83651

McDermott Road Industrial
New Construction, Infrastructure - 703,300 SF
Pending Verification
$378,000,000 CJ est. value
Nampa, ID 83687

I-84: Benson Creek and Moores Hollow interchange bridges
Infrastructure
Design
$4,541,997 CJ est. value
Caldwell, ID 83605

Parma Dechlorination Project
Renovation
Post-Bid
$300,000 CJ est. value
Parma, ID 83660

Birch Force Main
Renovation
Results
Nampa, ID

Maple Leaf Townhomes
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Nampa, ID 83687

Western Regional Lift Station
Renovation
Results
Nampa, ID

Commercial Tire / Nampa
New Construction, Infrastructure - 13,626 SF
Pending Verification
$1,000,000 CJ est. value
Nampa, ID 83651

Last Updated 09/22/2022 04:22 PM
Project Title

WWTP Phase II - Group F

Physical Address View project details and contacts
City, State (County) Nampa, ID 83651   (Canyon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2021
Bids Due View project details and contacts
Estimated Value $126,400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will enable the Nampa Wastewater Treatment Plant to produce Class A recycled water for irrigation and industrial reuse. The major Project elements include expansion of the secondary treatment system, new tertiary filtration, disinfection, sidestream treatment, expansion of the Solids Handling Facility, and a new pump station and pipeline for recycled water conveyance. The City has selected the Progressive Design-Build delivery model for the Project. As of August 3, 2021, this project is in design. A timeline for bidding and construction has not been announced.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents