Similar Projects
Stormwater Pond Bulkhead Improvements
Post-Bid
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Lift Station F04 Seawall Replacement
Results
$45,000 est. value
Merritt Island, FL 32940

Culvert Pipe Replacement - Units 24 and 25
Results
Less than $1,295,000 est. value
Palm Bay, FL 32907

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Dredged Material Management Area BV-11 Construction
Results
$1,000,000 to $5,000,000 est. value
FL

Gramling Park Drainage Improvements
Infrastructure
Post-Bid
Melbourne, FL 32901

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

CS-1 Sliplining (Fellsmere Grade)
Infrastructure
Post-Bid
$200,000 est. value
Palm Bay, FL

Drainage Repair
Results
Less than $300,000 est. value
FL

Golf Course Lake Bank Restoration
Infrastructure
Post-Bid
Barefoot Bay, FL

Culvert Pipe Replacement - Units 2, 3, 4, 43, and 47
Results
Less than $332,362 est. value
Palm Bay, FL 32907

Thrush Drive Baffle Box
Results
$579,460 est. value
Melbourne, FL 32935

Malabar Road Drainage Pipe Repairs
Results
Less than $500,000 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement Unit 20
Results
Less than $318,920 est. value
Palm Bay, FL 32907

Last Updated 10/12/2021 10:31 AM
Project Title

Culvert Pipe Replacement - Unit 48

Physical Address View project details and contacts
City, State (County) Palm Bay, FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal, disposal, re-installation, and restoration of street crossing drainage pipes located in the City of Palm Bay’s Port Malabar Unit (PMU) 48. Construction of the project is considered turn-key and will include all aspects of work including but not limited to all incidentals required to complete the project such as utility relocations, material furnishings, and restoration work associated with the installation of the pipes

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents