Similar Projects
Memphis Waterfront Tower Mixed Use
Renovation
Conception
Memphis, TN 38103

757 Court Mixed Use
New Construction - 26,300 SF
Conception
$500,000 to $1,000,000 CJ est. value
Memphis, TN 38105

Nylon Net Building
New Construction - 184,690 SF
Design
$47,282,374 est. value
Memphis, TN 38103

The Conwood II
New Construction - 11,000 SF
Design
$62,000,000 est. value
Memphis, TN 38107

The Walk at Union
New Construction - 643,932 SF
Post-Bid
$10,000,000 CJ est. value
Memphis, TN 38103

MH Strategies RAD I & II
Renovation
Post-Bid
Memphis, TN

Montgomery Plaza Dwelling Units - Phase II
Renovation
Results
Memphis, TN 38106

MHA High Rise Dwelling Units at Jefferson Square and Borda Towers
Renovation
Results
Memphis, TN

Link Apartments
New Construction - 388,902 SF
Construction
$25,000,000 est. value
Memphis, TN 38112

The Dominos Village
New Construction - 300,000 SF
Pending Verification
$100,300,000 est. value
Memphis, TN 38105

South Main Development
New Construction
Pending Verification
$23,580,000 est. value
Memphis, TN 38103

Thornwood Apartments
New Construction - 129,500 SF
Conception
$10,000,000 CJ est. value
Germantown, TN 38138

Uptown Greyhound Development
New Construction, Renovation - 34,000 SF
Design
$29,000,000 est. value
Memphis, TN 38105

Kirby Pointe Apartments
New Construction
Post-Bid
$20,000,000 est. value
Memphis, TN 38141

MHA High Rise Dwelling Units at Jefferson Square and Venson Center
Renovation
Results
Memphis, TN

Reported 06/29/2022 12:50 PM
Project Title

Manor at Hall Creek, Phases 1 and 2

Physical Address View project details and contacts
City, State (County) Arlington, TN 38002   (Shelby County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a residential development in Arlington, Tennessee. Conceptual plans call for the construction of a 56-unit residential development. Plans call for the construction of a 56 lot residential subdivision. As of June 28, 2022, this project is in the early planning stages, and a land disturbance application has been approved by the Arlington Planning Commission for Phase 2. Phase 1 has also received recommendation of approval for construction plans and final plat from the Planning Commission. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to fourth quarter of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents