Similar Projects
Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Porsche / Albany
New Construction, Infrastructure - 25,254 SF
Conception
$7,000,000 CJ est. value
Latham, NY 12110

Pepper Woods
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Latham, NY 12110

New York State Insurance Fund Office Building at Riverhill Center / Latham
Demolition, New Construction, Renovation, Infrastructure - 133,000 SF
Design
$37,275,000 CJ est. value
Latham, NY 12110

Facility Management
New Construction, Infrastructure - 32,310 SF
Bidding
$15,000,000 CJ est. value
Albany, NY 12205

Natural Playground Equipment
Infrastructure
Bidding
$70,000 CJ est. value
Bethlehem, NY 12158

Clinton Phase II
New Construction, Renovation, Infrastructure
Sub-Bidding
$7,000,000 CJ est. value
Albany, NY 12210

Storage Tank Services
Term Contract
Post-Bid
Watervliet, NY 12189

Clinton Market Collective
New Construction
Post-Bid
Albany, NY 12207

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)
Results
$500,000 to $1,000,000 est. value
Albany, NY 12203

World-Wide Water Storage Tank Remediation
Term Contract
Results

2022 Water and Sewer Improvements
Infrastructure
Construction
$3,337,172 CJ est. value
Albany, NY 12210

South Pearl Street Group Living Shelter Addition
Addition, Demolition, Infrastructure - 30,972 SF
Pending Verification
$5,000,000 CJ est. value
Albany, NY 12202

Sherwood Estates Conservation Subdivision
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Latham, NY 12110

Hudson Valley Credit Union
Demolition, New Construction, Infrastructure - 4,600 SF
Conception
$1,500,000 CJ est. value
Latham, NY 12110

Last Updated 10/12/2022 12:36 PM
Project Title

Pump Station and Tanks - Harriman 750,000 Ground Storage and Pump Station - City of Albany

Physical Address View project details and contacts
City, State (County) Albany, NY 12207   (Albany County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $275,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is included in the city's FY 2022-2026 Capital Improvement Program. As of October 12, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents