Similar Projects
Last Updated | 09/02/2020 04:52 PM |
Project Title | Mainline Pavement Reconstruction Part A-C |
Physical Address | View project details and contacts |
City, State (County) | Bryan, OH (Williams County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $80,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PROJECT NO. 39-20-01 PROJECT NO. 39-20-01 (PART A) MAINLINE PAVEMENT RECONSTRUCTION MILEPOST 0.00 TO MILEPOST 7.26 WILLIAMS COUNTY, OHIO PROJECT NO. 39-20-01 (PART B) TOLL PLAZA 4 SITE CONSTRUCTION MILEPOST 3.5 WILLIAMS COUNTY, OHIO PROJECT NO. 39-20-01 (PART C) TOLL PLAZA 4 WETLAND CONSTRUCTION MILEPOST 3.6 WILLIAMS COUNTY, OHIO The Work to be performed under the Contract for Project No. 39-20-01 (PART A), if any is awarded on the basis of the Bids, consists of removing and reconstructing the pavement in the right two (2) lanes and shoulder in both directions of the Ohio Turnpike. The Work includes, but is not limited to, inside widening pavement to the median with an addition lane and shoulder in both directions, excavating existing pavement, constructing full depth pavement, chemically stabilizing the subgrade, constructing approach and departure ramp pavement for new plaza in both directions, constructing a new access drive, demolishing the existing Westgate Toll Plaza, performing drainage repairs and replacements, installing concrete barrier wall, asphalt curbs, guardrail, performing approach slab replacements, installing new box trusses and cantilever sign supports, pavement markings and other traffic control devices, performing temporary traffic control, tree removal, clearing and grubbing, right of way fence replacement, installing new ramp light foundations, light poles, pull boxes, installing a water well and septic system, and coordination with the 58-21-01 Building Contractor and the Toll Collection Systems Integrator Contractor on both the north and south sides of the Ohio Turnpike. The Work to be performed under the Contract for Project No. 39-20-01 (PART B), if any is awarded on the basis of the Bids, consists of but not limited to, excavating and constructing embankment for grading preparation of the entire toll plaza site, chemically stabilizing the subgrade, performing drainage installations, guard rail installation, constructing full depth asphalt pavement, installation of pavement markings and other traffic control devices, and coordination with the 58-21-01 Building Contractor and the Toll Collection Systems Integrator Contractor on both the north and south side of the Ohio Turnpike. The Work to be performed under the Contract for Project No. 39-20-01 (PART C), if any is awarded on the basis of the Bids, consists of but not limited to, excavating and constructing embankment for the proposed Wetland, performing drainage installations, constructing habitat structures, planting trees and shrubs, and seeding the entire site with 4 different types of seed on the north side of the Ohio Turnpike. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |