Similar Projects
On Call A and E QBS
New Construction, Infrastructure
Bidding
Portland, OR

Hawthorne Bridge Approach Deck Rehabilitation
Infrastructure
Bidding
$1,200,000 to $1,400,000 est. value
Portland, OR 97214

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

Construction Manager/General Contractor Services for Central Library - Work Package 1
New Construction - 115,000 SF
Post-Bid
$81,531,900 est. value
Bend, OR 97703

Construction Manager/General Contractor Services for Redmond Library - Work Package 2
New Construction
Results
$34,260,600 est. value
Redmond, OR 97756

Parks Wilfire Recover Plan Phase II
Infrastructure
Bidding
$161,155 est. value
Salem, OR

Uo Retainer Program - Construction Services - Extended Period
Term Contract
Post-Bid
Eugene, OR 97403

Engineering Service For Main Street Canyonville Srts Project
Infrastructure
Results
$3,330,000 est. value
Canyonville, OR 97417

Air Traffic Control Tower Site Study and Design
Renovation, Alteration
Post-Bid
Bend, OR 97701

Storm Debris Removal Monitoring Services
Infrastructure
Results
OR

Wastewater Treatment Plant in Vessel Composting Feasibility
Infrastructure
Post-Bid
Ashland, OR

Reported 11/20/2021 12:00 AM
Project Title

Engineering Consultant Services

Physical Address View project details and contacts
City, State (County) OR   (Deschutes County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide engineering design services for the Smith Rock Way Bridge 15452 and Gribbling Road Bridge 17C30 Replacement project. The project will include Removing the existing structures, including all existing foundation elements within the canal channels Replacing the structures with single-span concrete structures and associated foundation elements. Reconstructing the roadway approaches, including paving and approach guardrail. The total Project cost, including engineering and construction, is estimated to be $1,899,700.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents