Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Saylorville Shoreline Erosion Protection Project
Term Contract
Design
Johnston, IA 50131

Willow Creek Streambank Stabilization
Infrastructure
Bidding
$170,000 est. value
Iowa City, IA 52246

Main Open Ditch Repairs
Infrastructure
Bidding
$428,500 est. value
Mason City, IA

Jones Street Culvert Installation
Infrastructure
Post-Bid
$110,000 est. value
Shellsburg, IA

Upper Wapsipinicon WMA - Phase 6 Watershed Improvements
Infrastructure
Post-Bid
IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Sunset Dr/IA Highway 28 and North Avenue Intersection Improvements
Infrastructure
Bidding
$2,088,769 est. value
Norwalk, IA

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

Last Updated 12/22/2021 03:38 AM
Project Title

Pipe Culverts - River Road

Physical Address View project details and contacts
City, State (County) IA   (Hardin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Route: River Road On River Road, Over Elk Run, s13 t89 r21 215.10 Units Clearing & Grubbing 1.00 Lump Sum Construction Survey 51.00 Linear Foot Culvert Pipe 211.80 Linear Foot Culvert, Precast 56.80 Square Yard Drives, p.c.c. 867.00 Cubic Yard Embankment-In-Place 594.80 Square Yard Engineering Fabric 103.00 Cubic Yard Excavation Class 10 1,770.00 Cubic Yard Excavation Class 20 150.00 Cubic Yard Excavation Class 22 480.70 Linear Foot Fence, Chain Link 90.00 Cubic Yard Granular Backfill 1.00 Each Handhole 4.00 Each Intakes & Manholes/Utility Access 0.60 Acre Mulching 383.50 Square Yard Paved Shoulders 9.12 Station Pavement Markings 1,167.00 Square Yard Pavement, p.c.c. 1.00 Lump Sum Pipe Lining 136.00 Linear Foot Rail, Metal 165.80 Square Yard Recreational Trail, Pcc 60,546.00 Pound Reinforcing Steel 693.00 Pound Reinforcing Steel, Epoxy Coated 1,072.20 Square Yard Removal Of Pvmnt/Drives/Sdwk 1,063.60 Ton Revetment 0.60 Acre Seeding & Fertilizing 16.00 Cubic Yard Selected Backfill 480.00 Linear Foot Sewer Sanitary 7.83 Station Shoulder Finishing 509.00 Linear Foot Silt Fence 449.90 Cubic Yard Structural Concrete 250.00 Pound Structural Steel 307.00 Cubic Yard Topsoil, Strip/Salvage/Spread 273.00 Linear Foot Water Main

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents