Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Municipal Water Well Improvements Rebid
Infrastructure
Design
$1,131,320 CJ est. value
Dayton, IA 50530

Prospect Support Facility Parking Lot Replacement Project
Infrastructure
Design
$1,169,000 CJ est. value
Des Moines, IA 50310

High School Addition & Renovation
Addition, Demolition, Renovation, Infrastructure - 192,000 SF
Bidding
$3,000,000 CJ est. value
Orange City, IA 51041

Bridge Replacement - PPCB
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Logan, IA 51546

New 5-6 Intermediate - Bid Package 3 Landscaping and Seeding
Infrastructure
Sub-Bidding
Cedar Rapids, IA 52404

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

Proposed Wastewater Improvements
Renovation
Post-Bid
$987,000 est. value
Columbus Junction, IA

Revetment
Infrastructure
Results
IA

Earlham Lagoon Upgrades
Renovation
Results
$3,979,000 est. value
Earlham, IA 50072

Duane Arnold Solar I
New Construction, Infrastructure
Pending Verification
$64,000,000 CJ est. value
Palo, IA 52324

Shelter - City Of Des Moines
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Des Moines, IA 50309

Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

Two Basketball Courts at Hughes Park
Infrastructure
Design
$500,000 CJ est. value
Cedar Rapids, IA 52404

Last Updated 09/09/2022 11:34 AM
Project Title

Wastewater Treatment Facility System Improvements

Physical Address View project details and contacts
City, State (County) Albia, IA 52531   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Water and Wastewater Facilities, Buildings Rehabilitation/Renovation, Sanitary Sewer (Gravity), Sewer Pump Station, Sewer Force Main, Electrical and Controls, Instrumentation, Culverts, Waterways, Stormwater Channels, Construction, Demolition/Building Removal/Hauling/Salvage, Concrete/Formed/Flatwork/Foundation, Electrical Installation/Construction, Fittings and Valves, Erosion Control/Slope, Bank Stabilization, Grade and Surface, Excavation, Stormwater Improvements, Erosion Control - Temporary, Culinary Water Improvements, Lift Stations/Lift Station Equipment, Plumbing, Heating, Ventilation, Air Conditioning (HVAC), Watershed Protection/Riprap, Sewer and Water Construction, Sitework/Excavating and Grading, Roofing, Painting, Water/Wastewater Infrastructure, Grubbing & Clearing. There are two wastewater treatment sites that both include the retrofitting of the existing lagoon cells with an upgraded aerated lagoon system followed by the installation of submerged, fixed-film media reactors. The reactors consist of a clean gravel bed that provides surface area for nitrifying bacteria to grow and populate. An ultraviolet (UV) disinfection system on each of the discharge lines will also be installed to inoculate E.coli prior to final discharge. Work also includes structures, grading, utilities, controls, seeding, maintenance and compliance with a stormwater pollution protection plan, and all other miscellaneous work required to complete the project in accordance with plans and specifications. The project includes the sludge dredging of all cells with appropriate disposal, and the decommissioning of one cell. This project also includes North site access upgrades to provide a wide enough roadway that allows truck access to the North wastewater treatment site. Also includes all other miscellaneous work to complete this section in accordance with plans and specifications. If the plans and specifications are not returned within fourteen days after award of the project and in a reusable condition, the deposit shall be forfeited. Plans and specifications may also be obtained by download from the ISG website.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents