Last Updated 02/16/2021 11:30 AM
Project Title

Concrete Paving At Upper Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Saint George, SC 29477   (Dorchester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide the following services: 1. Prep and pour concrete and curbing where required, as indicated in Attachment 3, Concrete Paving Detail. All measurements on the drawing are approximate and must be field verified by the contractor for accuracy. 2. Raise all valve boxes in the area to be poured (project area) so the top of the valve is flush with the newly poured concrete. 3. Any damage to existing pavement or County property caused by the contractor shall be their responsibility to repair. 4. Provide a smooth transition from the existing concrete surfaces to the new concrete. 5. Remove and dispose of all old materials and debris from site after the pour is complete (not in a County/W&S dumpster). 6. Backfill and tamp areas around the new concrete with good topsoil after the pour is complete.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents