Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

24-Inch Raw Water Main & 20-Inch Finished Water Main Extension
Infrastructure
Bidding
Monroe, Waco, GA

Polyethylene Pipe Replacement Project
Post-Bid
Lawrenceville, GA 30046

Water and Sewer Indefinite Quantity Mechanical Contractor
Post-Bid
Less than $2,000,000 est. value
Cumming, GA 30040

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

CDBG 2019 Water System Improvements
Results
Marshallville, GA 31057

Outfall (NPRL) Line Extension to Taylors Creek
Infrastructure
Bidding
Hinesville, GA

Highway 520 Water Line Replacement at Bagley Creek
Post-Bid
GA

2019 CDBG Water System Improvements
Results
Milan, GA 31060

Taylors Creek Extension
Infrastructure
Bidding
Hinesville, GA

Steel Pipes, Valves and Fittings
Post-Bid
Atlanta, GA 30303

Creekside S/D Main Extension
Results
Social Circle, GA

Water System Advanced Metering Infrastructure
Infrastructure
Bidding
GA

Westside Business Park Infrastructure Expansion Phase 3
Post-Bid
Bemiss, GA 31602

FNST Water Line Upgrade, Phase 1
Results
Cleveland, GA 30528

Last Updated 02/17/2022 09:13 AM
Project Title

Cassville-White Road and I-75 Water Main Relocation

Physical Address View project details and contacts
City, State (County) GA   (Bartow County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of furnishing all labor, materials, tools, equipment and incidentals necessary for construction of approx. 380 LF of 16-inch DIP water main, 800 LF of 12-inch DIP water main, 400 LF of 2-inch water main, 80 LF of 24-inch steel casing (bored), 2 fire hydrants, and 2 service re-connections; all with related, valves, fittings, appurtenances, clearing, erosion control, traffic control, flushing, hydrostatic testing, and disinfection, site restoration and grassing, pavement replacement, clean-up, and other incidentals required to complete the work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents