Similar Projects
Bridge and Approaches - SH 49
Infrastructure
Design
$898,190 CJ est. value
Lawton, OK 73507

Bridge and Approaches - SH 49
Infrastructure
Design
$898,190 CJ est. value
Lawton, OK 73507

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Waterline Fittings and Valves
Infrastructure
Results
Lawton, OK

This Project Is To Extend A Water-Main At Fletcher, Oklahoma
Term Contract
Results
Fletcher, OK 73541

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Relocating the Proposed Community Development Block Grant Project
Infrastructure
Post-Bid
Sterling, OK

Pavement Resurfacing, Lee Boulevard Phase 1
Infrastructure
Results
$3,500,000 to $4,500,000 est. value
Lawton, OK 73558

Construction of Adjacent Parking Lot
Infrastructure
Design
$467,000 CJ est. value
Lawton, OK 73501

2021 Emergency Waterline Replacement Project
Infrastructure
Post-Bid
Lawton, OK

Slabjacking and Subsealing Services
Infrastructure
Results

Bridge and Approaches - SH 7
Infrastructure
Design
$2,317,417 CJ est. value
Lawton, OK 73501

Hydrant Guard Post
Infrastructure
Post-Bid
Elgin, OK

2021 Waterline Project
Infrastructure
Results
Sterling, OK

Last Updated 03/29/2023 04:10 AM
Project Title

Grade, Drain and Surface - US 277

Physical Address View project details and contacts
City, State (County) Lawton, OK 73501   (Comanche County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2025
Bids Due View project details and contacts
Estimated Value $3,710,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us 277: From Just E. Of the Nb H.e. Bailey Tpk Off Ramp E. 0.4 Mis. To the Us 277/sh 17 Intersection. As of March 29, 2023, the project is in Design status. Anticipated letting month/year is May, 2024. Length : 0.400 Mi OKDOT - Grade, Drain and Surface - US 277 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents