Similar Projects
Roadway Improvements (Turn Lane Addition, Grading, Drainage, Pavement, Micro-Milling, Resurfacing, and Traffic Stripe) on SR-171 at Prewitt Loop Road
Infrastructure
Bidding
$1,334,302 CJ est. value
Northport, AL 35475

Roadway Improvements (Turn Lane Addition, Grading, Drainage, Pavement, Micro-Milling, Resurfacing, and Traffic Stripe) on SR-171 at Prewitt Loop Road
Infrastructure
Bidding
$1,334,302 CJ est. value
Northport, AL 35475

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Citizens Water Service - Water Main Extension
Infrastructure
Post-Bid
Vance, AL

Bryce Campus Utilities and Infrastructure
Results
$1,200,000 to $1,400,000 est. value
Tuscaloosa, AL

Clinical Services & Research MRI Addition - Early Foundation
Results
$950,000 est. value
Tuscaloosa, AL 35404

Crisstown Road Water Main Replacement
Infrastructure
Construction
$200,000 est. value
Tuscaloosa, AL

Water Main Relocation
Infrastructure
Construction
Northport, AL

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

University Medical Center Clinical Enhancment Phase III
New Construction, Infrastructure
Bidding
$264,999 CJ est. value
Tuscaloosa, AL 35401

RFP Construction Manager - Medical/Psychiatric and Minimum-Security Dormitory addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Rose Administration Watermain Replacement
Results
$140,000 est. value
Tuscaloosa, AL

Fit Foodz / Tuscaloosa
Addition, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tuscaloosa, AL 35401

University Club Site Package
Infrastructure
Bidding
$620,000 CJ est. value
Tuscaloosa, AL 35401

Last Updated 10/31/2022 04:33 PM
Project Title

Peterson Water System - 2022 Water Main Replacements

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $347,707 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

***As of October 31, 2022. Bid rejected. The Project shall be known as Peterson Water System - 2022 Water Main Replacements and the general character of said project shall consist of 4,500 linear feet of 6" and 3" water main replacement and appurtenances. All bidders must be responsible, meeting the criteria and requirements set forth in the Instructions to Bidders and bid proposal. Prequalification of Bidders is not required; however, specific requirements must be submitted with the proposal. The attention of all bidders is called to the provisions of State law governing "general Contractors," as set forth in AL. CODE 34-8-1, et seq. (1975), and rules and regulations promulgated pursuant thereto. The Owner may not enter into a contract with a non-resident corporation or entity which is not qualified under State law to do business in the State of Alabama. All bidders shall possess all other licenses and/or permits required by applicable law, rule or regulation of the performance of the work. All bidders must submit with their proposal, Contractor's license number and a copy of the license. State law, AL CODE 34-88(b), requires all bids to be rejected which do not contain the General Contractor's current license number. Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks will be made payable to the Owner for an amount not less than 5 percent of the Owner's or its Engineer's estimated cost of the project or of the total bid in the proposal, but in no event more than $10,000.00. A Pre Bid Conference IS NOT required for this project. All bidders are advised to carefully read the Instructions to Bidders contained in the Contract Documents, which provisions and requirements are adopted herein by reference.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents