Similar Projects
Last Updated | 09/10/2020 09:38 AM |
Project Title | Single Span Structure Replacement |
Physical Address | View project details and contacts |
City, State (County) | Tuscola, IL 61953 (Douglas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $296,031 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Proposed Improvement Consists of the Replacement of the Existing Single Span Structure With a New Single Span 27" Deep Ppc Deck Beam Bridge (1,747 Sft), Concrete Structures (21.5 Cyd), Furnishing and Driving Steel Piles Hp 12x53 (300 Ft), Reinforcement Bars (2,430 Pounds), Structure Excavation (146 Cys), Controlled Low-strength Material (49.8 Cys), Stone Dumped Riprap, Cl A4(162 Ton), Traffic Control & Protection, Special (1 Lsum), and Other Items of Related Construction. Project Location: TR 119 (600N) over Arcola Drainage Ditch approximately 5.4 miles Southeast of Tuscola, Illinois |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |