Similar Projects
Facility Renovations - Clatsop County
Renovation
Conception
$1,000,000 CJ est. value
Astoria, OR 97103

US 26: Little Humbug Creek Bridge
Demolition, New Construction, Infrastructure
Design
$3,053,000 CJ est. value
Seaside, OR 97138

Broadway Field Renovation
New Construction, Infrastructure
Design
$4,600,000 CJ est. value
Seaside, OR 97138

RFQ D/B - Design/Build Highway 30 Retaining Wall at Tongue Point Job Corps Center
Infrastructure
Bidding
$1,000,000 CJ est. value
Astoria, OR 97103

Warrenton Main Avenue at 9th Street Safe Routes to School
Infrastructure
Bidding
$680,000 CJ est. value
Warrenton, OR 97146

Plympton Creek Pile Removal
Infrastructure
Post-Bid
$300,000 est. value
OR

OR202: Dresden St. To 4th St. (Astoria) Sec.
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Astoria, OR 97103

Mouth of the Columbia River Sand Island Pile Dikes Repair
Infrastructure
Results
$49,037,000 CJ est. value
Astoria, OR 97103

Pavement Management Project: 2023
Infrastructure
Results
$325,114 CJ est. value
Warrenton, OR 97146

Sub-bids - Seaside School District New Middle/High Schools - Bid Package: #4 - All Other Work
Addition, Demolition, New Construction, Renovation, Infrastructure
Construction
$82,000,000 CJ est. value
Seaside, OR 97138

Fairfield Inn by Marriott / Astoria
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Astoria, OR 97103

2021 Bond - Knappa School District
New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Astoria, OR 97103

16th Street Distribution Waterline Project
Infrastructure
Bidding
$250,000 CJ est. value
Astoria, OR 97103

RFP Construction Manager - Cannon Beach Elementary School Renovation
Infrastructure, Renovation - 13,500 SF
Post-Bid
$700,000 CJ est. value
Cannon Beach, OR 97110

Pavement Management Project 2023
Infrastructure
Results
$325,114 CJ est. value
Warrenton, OR 97146

Last Updated 02/13/2024 04:09 PM
Project Title

Midtown Restrooms Addition and Remodel

Physical Address View project details and contacts
City, State (County) Cannon Beach, OR 97110   (Clatsop County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $535,436 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City of Cannon Beach Invitation to Bid Sealed bids for the Midtown Restrooms Addition and Remodel Project. All bidders shall submit, in a separate, sealed envelope, within two working hours of the bid opening time, on the bid date, a completed First-Tier Subcontractor Disclosure Form in compliance with ORS 279C.370. Question Deadline 02/26/2024 SUBSTITUTION, CLARIFICATION, OR CHANGE AND SOLICITATION PROTEST DEADLINE In general, the elements of work include, but are not limited to: A remodel of the existing Midtown public restrooms as well as a building expansion to increase the number of fixtures available for customer use at this location. Contractor shall build as designed and engineered in the plans included as Exhibit F to this invitation to bid. City has pre-selected desired fixtures to match those in place at other City-owned public restrooms. Contractor shall provide all noted materials unless otherwise specified. To accommodate heavy visitor traffic and ensure public safety, construction shall occur in two phases: 1 The restroom addition shall be constructed as the first phase. The existing restroom facility must always remain operational and accessible to the public at this time. 2 The remodel of the existing restroom facility shall be the second phase. During the remodel, the addition completed as phase one must always remain operational and accessible to the public. Responsive bidders shall demonstrate proven experience working around sensitive, critical infrastructure like sewer force mains, gas lines, etc. All bidders shall comply with the provisions of ORS 279C.800-870 [workers on public works to be paid not less than prevailing rate of wage for projects over $50,000.00]. Contractors submitting bids are required to be registered with the Construction Contractor's Board. The Owner reserves the right to reject any bid not in compliance with all prescribed public bidding procedures and requirements, may reject a bid that does not comply with requirement to demonstrate bidder's responsibility under ORS 279C.375(3)(b), and may reject, for good cause, any or all bids upon a finding of the Owner that it is in the public interest to do so in accordance with ORS 279C.395. The Owner reserves the right to waive any bid irregularities or informalities.

Details

283 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents