Similar Projects
Misc. Buildings, Site Development Construction Project Lead, Cannon Beach, OR 97110 (Clatsop County)
Last Updated | 02/13/2024 04:09 PM |
Project Title | Midtown Restrooms Addition and Remodel |
Physical Address | View project details and contacts |
City, State (County) | Cannon Beach, OR 97110 (Clatsop County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2024 |
Bids Due | View project details and contacts |
Estimated Value | $535,436 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | City of Cannon Beach Invitation to Bid Sealed bids for the Midtown Restrooms Addition and Remodel Project. All bidders shall submit, in a separate, sealed envelope, within two working hours of the bid opening time, on the bid date, a completed First-Tier Subcontractor Disclosure Form in compliance with ORS 279C.370. Question Deadline 02/26/2024 SUBSTITUTION, CLARIFICATION, OR CHANGE AND SOLICITATION PROTEST DEADLINE In general, the elements of work include, but are not limited to: A remodel of the existing Midtown public restrooms as well as a building expansion to increase the number of fixtures available for customer use at this location. Contractor shall build as designed and engineered in the plans included as Exhibit F to this invitation to bid. City has pre-selected desired fixtures to match those in place at other City-owned public restrooms. Contractor shall provide all noted materials unless otherwise specified. To accommodate heavy visitor traffic and ensure public safety, construction shall occur in two phases: 1 The restroom addition shall be constructed as the first phase. The existing restroom facility must always remain operational and accessible to the public at this time. 2 The remodel of the existing restroom facility shall be the second phase. During the remodel, the addition completed as phase one must always remain operational and accessible to the public. Responsive bidders shall demonstrate proven experience working around sensitive, critical infrastructure like sewer force mains, gas lines, etc. All bidders shall comply with the provisions of ORS 279C.800-870 [workers on public works to be paid not less than prevailing rate of wage for projects over $50,000.00]. Contractors submitting bids are required to be registered with the Construction Contractor's Board. The Owner reserves the right to reject any bid not in compliance with all prescribed public bidding procedures and requirements, may reject a bid that does not comply with requirement to demonstrate bidder's responsibility under ORS 279C.375(3)(b), and may reject, for good cause, any or all bids upon a finding of the Owner that it is in the public interest to do so in accordance with ORS 279C.395. The Owner reserves the right to waive any bid irregularities or informalities. |
||||||||||||||||||||||||||||||||
Details | 283 SF.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |