Similar Projects
Spwrp General Construction Projects
Term Contract
Post-Bid
Englewood, CO 80110

Portable Chemical Toilets Services and Rentals
Term Contract
Post-Bid
CO

Mosquito Management
Results
Glenwood Springs, CO 81601

BPA for Toilet Pumping Services
Results
Gunnison, CO

On-Call and Emergency Portable Toilet Rentals-All City Including Denver Airport
Term Contract
Post-Bid
Denver, CO 80202

Window Washing Services
Term Contract
Results
Fort Collins, CO 80523

Pest Control for RTD Facilities
Term Contract
Post-Bid
Denver, CO

Fiberglass Enclosures Secondary Hand Holes
Results
Less than $90,000 est. value
Loveland, CO 80537

Custodial Services
Term Contract
Post-Bid
CO

PAFB, CMAFS - Oil & Water Separator Service
Term Contract
Results
Colorado Springs, CO 80914

Building 15 Laboratory Clean-Up
Post-Bid
Lakewood, CO

Pest Control for 2020
Term Contract
Results
Greeley, Longmont, CO

Janitorial Services South Adams County Water And Sanitation District
Post-Bid
Commerce City, CO

Internet Service Provider – Warehouse (Whse)
Post-Bid
CO

Janitorial Services Moore Parks Shop
Post-Bid
Durango, CO 81301

Reported 09/22/2020 12:00 AM
Project Title

4Sbde CPX III Gray Water Tanks and HWS

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all necessary equipment for different sized hose inputs from 1" to 4" hoses. Contractor shall place gray water storage tanks at specified locations by the requestor and shall move equipment if needed within 24 hours of notification at no additional cost to the government. Contractor shall service gray water tanks twice daily for the duration of the requirement to include weekends. Times of servicing gray water tanks shall be conducted between 1200 and 1500, and 2200 and 0300. Servicing includes removal of gray water from tanks, and maintenance on tanks, hoses and fittings maintaining serviceable equipment

Details

Division 22 - Plumbing, Facility Sanitary Sewerage, Facility Gray Water Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents