Similar Projects
Last Updated | 12/17/2020 09:38 AM |
Project Title | Post 4 Lift Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Tinley Park, IL 60477 (Cook County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $533,904 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish and install ne control building including: Pump control panel and SCADA system, electrical distribution panels arranged for 277/480V, 30, 4-wire electric service, variable frequency drives on existing 34 Hp submersible type pumps. Furnish and install new digital transit time flow monitor. Furnish and install new level management system in existing wet well. Furnish and install NEMA 4X stainless steel pump cable junction box. Demolition of existing walk-in style fiberglass control building. Access drive, sidewalk, and landscape restoration. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |