Similar Projects
Downtown Park Phase II - PR 1285
Design
Cary, NC

RFP Construction Manager at Risk - Dabney Hall Renovation
Bidding
$60,000,000 est. value
Raleigh, NC 27607

Design - New Education Building - Front Entrance Renovation
Renovation, Infrastructure
Bidding
$671,000 est. value
Raleigh, NC 27601

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Engineering Consultants for Flood Control and Stormwater Design Services
Post-Bid
NC

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Professional Services for Capital Improvement Project Cost Estimating
Term Contract
Bidding
Raleigh, NC

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Engineering - NC State Fairgrounds - Campground Road Paving Project
Infrastructure
Bidding
$1,500,000 est. value
Raleigh, NC 27606

Designer Selection
Post-Bid
Cary, NC 27519

Indefinite Delivery Indefinite Quantity (IDIQ) Architect-Engineer (A-E) Contract for Surveying and Mapping Services
Results
Less than $5,000,000 est. value

Design - D.H. Hill, Jr. Library Comprehensive Study
Renovation, Alteration
Bidding
$125,000 est. value
Raleigh, NC 27695

Engineering, Planning and Development
Post-Bid

Reported 05/26/2022 12:00 AM
Project Title

Electric Vehicle (EV) Charging Stations at Parking Deck 75

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected May 2023
Bids Due View project details and contacts
Estimated Value $2,281,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Infrastructure for 73 Electric Vehicle (EV) Charging Stations in Parking Deck 75. This is an Executive Order 80 Project to provide EV charging stations for State-owned plug-in electric vehicles. Location of EV charging stations - lower levels of Parking Deck 75 (downtown Raleigh, between N. Salisbury St and N. McDowell St/Capital Blvd.) Upgrade electric service to Parking Deck 75. Existing service is 480/277V, 400A service. Loads include elevators and lighting. New Service to be 120/208V service, 1600A or 2000A. New service from local electric utility company. Provide 1000 SF electrical room for new electrical switchgear and distribution. Use 1" PVC coated Rigid Steel Conduit (robroy conduit). All panels and disconnects NEMA 4X-Stainless Steel. Provide contactors and controls to enable scheduling hours of use, and/or access control for using charging stations. 40A or 50A circuit breaker for each circuit. Use #8 copper conductors. Includes sitework, utility and landscaping.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents