Similar Projects
Rock Island Substation, Physical Protection Improvements
New Construction
Bidding
Colorado Springs, CO 80909

Purchase of Materials for the Cardnell Substation
Term Contract
Post-Bid
Glenwood Springs, CO 81601

Cardnell Substation - Materials
Post-Bid
Glenwood Springs, CO 81601

East Substation E1 Transformer Replacement
Results
Loveland, CO 80537

Midway KV1A Replacement
New Construction
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Rattlesnake Solar - Hudson
New Construction
Construction
Hudson, CO

Sep Briargate Substation Control Enclosure
New Construction
Post-Bid
CO

AULT-Badwater-North Cody Equipment Install
Results
$1,000,000 to $5,000,000 est. value
CO

Construction Services for The Second Controllable Grid Interface (CGI) Project at The NREL Flatirons Campus
New Construction
Post-Bid
Boulder, CO

Design-Build of "Eastside" Distribution Substation
Term Contract
Results
Fountain, CO 80817

Horizon Substation Control Enclosure
New Construction
Post-Bid
CO

Cardnell Substation Construction - Installation
Results
Glenwood Springs, CO 81601

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Horseshoe Electrical Substation Improvement Project
Results
Loveland, CO 80537

SEP Horizon Three Phase Variable Shunt Reactor
New Construction
Post-Bid
Colorado Springs, CO

Reported 07/10/2021 12:00 AM
Project Title

Shunt Reactor for Hayden Substation

Physical Address View project details and contacts
City, State (County) Hayden, CO   (Routt County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish the Item No. 0001 shunt reactor as described in this section. These specifications provide the minimum electrical and mechanical requirements for dry type, air core, single-phase shunt reactor, suitable for outdoor use. The shunt reactor shall be in accordance with the latest revision of the Industry Standards stated, including ANSI Standard C57.21and International Standard IEC 289 as applicable, except for any deviations from the Industry Standard as described in these specifications. In the event of contradictory requirements between Industry Standards and these specifications, the terms and requirements of these specifications shall have precedence over the Industry Standards. Each reactor shall be equipped with suitable attachments for lifting and shall be designed for installation outdoors and to be impervious to moisture and other weather hazards. Only new equipment of current and present day manufacture shall be furnished. Each shunt reactor shall be suitable for base mounting, furnished with a supporting structure and hardware to connect reactors to support structures, and be suitable for daily switching. In addition, each reactor shall be Class AA type self-cooled, and suitable for operation at a nominal frequency of 60 hertz.

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents