Similar Projects
New Police Facility - City of Pullman
New Construction, Infrastructure
Conception
$8,250,000 CJ est. value
Pullman, WA 99164

Fire Station 3 - City of Pullman
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Pullman, WA 99163

RFQ D/B - Schweitzer Engineering Hall
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Pullman, WA 99163

Boyer Park and Marina Dock Utility Project
Infrastructure
Bidding
$270,000 CJ est. value
Colfax, WA 99111

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Post-Bid
$89,000,000 CJ est. value
Pullman, WA 99163

M and O Expansion Grading 2022
Infrastructure
Post-Bid
Pullman, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Albion Drive Roundabout Improvements
Demolition, Alteration
Results
WA

Pullman-Moscow Regional Airport - PMRA Terminal 2020
New Construction, Infrastructure
Construction
$49,000,000 CJ est. value
Pullman, WA 99163

Pullman Regional Hospital - Patient Care Expansion
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Pullman, WA 99163

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

SR 26, Dusty to Colfax Add Climbing Lanes
Infrastructure
Post-Bid
$5,000,000 to $7,500,000 est. value
Lacrosse, WA 99143

Terre View Roundabout
Infrastructure
Results
Pullman, WA 99163

Accelerated Streets Resurfacing 2022
Infrastructure
Post-Bid
$368,000 est. value
Pullman, WA

Last Updated 02/09/2023 09:46 AM
Project Title

Shared Use Path on SR270 to Stadium Way

Physical Address View project details and contacts
City, State (County) Pullman, WA 99163   (Whitman County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $960,277 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 09, 2023, bids were canceled. No definite date for the rebid.**  Project Scope: & tempmargin; Install a concrete paved path that alternates between 10 and 12ft wide with 2ft gravel shoulders approximately 1 - 600 LF from the intersection of SR270 and Bishop Blvd westward to Stadium Way. Install new landscaping and irrigation along path - and pedestrian lights along 400 LF of path. Construction start anticipated to be May of 2023. Contract time shall be 90 days from Notice to Proceed to Substantial Completion. Proposal MUST BE based on this Contract Time. & tempmargin; Project is located along SR270 between the Bishop Blvd and Stadium Way Intersections. & tempmargin; Bid Estimate: $550,000-$600,000 & tempmargin; Alternate 1: Install 3" asphalt pavement in lieu of concrete pavement. Owner reserves the right to reject any and all bids and to waive any informalities or irregularities in the bids received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractor shall achieve Substantial Completion of the Work by Ninety (90) Days following Notice to Proceed, subject to adjustments as provided in the Contract Documents, and shall achieve Final Completion not later than Sixty (60) Days thereafter.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents