Similar Projects
New Bedford Municipal Piers Fendering and Repairs
Infrastructure
Bidding
$9,500,000 est. value
New Bedford, MA

Two Float Replacements
Post-Bid
Bourne, MA 02532

North Berth Passenger Access System Rehabilitation
Post-Bid
Less than $220,000 est. value
Salem, MA 01970

MWRA Boat Storage Facility and Cosgrove Deck Drainage Improvements - General Bids
Results
$1,800,000 est. value
Clinton, MA 01510

Timber Decking Replacement and Miscellaneous Work on Fishing Piers
Results
Less than $85,000 est. value
Wareham, MA 02571

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Dock Decking Replacement
Post-Bid
$20,000 est. value
Shrewsbury, MA 01545

Sesuit Harbor Floating Docks
Results
Dennis, MA 02660

Replacement of Pier Fender System, Plymouth Breakwater Footbridge
Alteration
Post-Bid
$100,000 to $250,000 est. value
Plymouth, MA 02360

Deep Water Berth In-Fill Platform Repairs
Results
Less than $250,000 est. value
Salem, MA 01970

Hingham Ferry Doc and Ferry Project
Infrastructure
Post-Bid
$18,300,000 est. value
Hingham, MA

Frederick B. Willis Fishing Pier Renovations
Results
Less than $701,000 est. value
Lynn, MA

Rehabilitation to the Existing Timber Eastern and Southern Piers
Infrastructure
Post-Bid
$870,456 est. value
Boston, MA

Remove and Replace Three Treated Timber Piles at Bass River Boat Ramp
Results
$24,939 est. value
Yarmouth, MA 02664

Oak Bluffs and Vineyard Haven Pile Wrap Project
Infrastructure
Post-Bid
$1,342,266 est. value
Falmouth, MA

Reported 07/01/2022 12:00 AM
Project Title

University of Massachusetts Boston - Service and Supply Loading Dock Repairs

Physical Address View project details and contacts
City, State (County) Boston, MA 02125   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of both full depth replacement and topside repairs to the existing concrete slab within the Service and Supply building loading and storage areas along with associated trench drains and water proofing.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents