Similar Projects
Byu Electrical Vaults Phase 3A
Renovation
Post-Bid
Provo, UT 84602

Institutional Residence Remodel
Post-Bid
$207,000 est. value
Orem, UT 84058

Lockhart Locker Room Remodel
Renovation
Results
Orem, UT 84058

Remodel Lakemount Manor
Results
Less than $3,100,000 est. value
Orem, UT 84058

BYU TMCB Interior Renovation
Renovation - 158,696 SF
Construction
Provo, UT 84604

HPER Building Nursing Offices
Renovation
Post-Bid
$425,000 est. value
Logan, UT 84322

Lehi Campus Building Remodel
Renovation
Results
$400,000 est. value
Lehi, UT 84058

Utah Valley University Campus Restroom Remodel
Renovation
Post-Bid
Orem, UT 84058

Campus Restrooms Remodel
Renovation
Results
Orem, UT 84058

BYU Harold B Lee Library Concrete Improvements
Renovation
Post-Bid
Provo, UT

Losee Center 309-311 Remodel
Renovation
Results
$140,000 est. value
Orem, UT 84058

EX Digital Media Classroom
Renovation
Post-Bid
Orem, UT 84058

AX 131 and 134 Remodel
Renovation
Results
$100,000 est. value
Orem, UT 84058

BYU Exterior Dock Canopy Addition
Addition - 5,330 SF
Post-Bid
Provo, UT 84604

DFCM Construction - UVU Sorensen Student Center Starbucks Tenant Improvement
New Construction - 1,213 SF
Results
$350,000 est. value
Orem, UT 84097

Last Updated 05/03/2022 12:46 AM
Project Title

Fulton Library Family Study Room Remodel

Physical Address View project details and contacts
City, State (County) Orem, UT 84097   (Utah County)
Category(s) Education
Sub-Category(s) College/University, Library - School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

College/University, Renovation, Library - School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents