Similar Projects
Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders
Infrastructure, Renovation
Design
$2,361,000 CJ est. value
Toutle, WA 98649

SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders
Infrastructure, Renovation
Design
$2,361,000 CJ est. value
Toutle, WA 98649

Pump Station Replacement
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Longview, WA 98632

Pump Station Replacement
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Longview, WA 98632

Asphalt Crushing Services
Infrastructure
Post-Bid
Longview, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Pacific Avenue North Half Bridge Replacement Project
New Construction, Infrastructure
Results
Kelso, WA

46th Avenue Construction - City of Longview
Demolition, New Construction, Infrastructure
Conception
$3,650,000 CJ est. value
Longview, WA 98632

I-5/SB Toutle River Bridge - Painting
Renovation, Infrastructure
Design
$4,085,000 CJ est. value
Castle Rock, WA 98611

Old Pacific Highway Overlay
Infrastructure
Bidding
$540,000 CJ est. value
Kelso, WA 98626

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 03/07/2023 11:05 AM
Project Title

SR 433 / Lewis and Clark Bridge - Expansion Joint Replacement

Physical Address View project details and contacts
City, State (County) Longview, WA 98632   (Cowlitz County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,009,305 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 7, 2023, the project has been awarded. A timeline for construction has not been established. Improving SR 433 by replacing and modifying the expansion joints in two locations on bridge No. 433 and other work. Involves 17 items and 24 working days. Work class 6. WADOT - SR 433 / Lewis and Clark Bridge - Expansion Joint Replacement This is a Federally funded contract with a 17% disadvantaged business enterprise goal. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents