Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Northwest Hangar Taxilane Construction at Friday Harbor Airport
Infrastructure
Bidding
$1,500,000 CJ est. value
Friday Harbor, WA 98250

3rd Street Improvements
Infrastructure
Bidding
$2,800,000 CJ est. value
Dayton, WA 99328

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Russell Creek Project
Alteration
Post-Bid
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Wine Country Road Roundabout and Utility Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Yakima, WA 98901

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Ready Mix Concrete
Alteration
Results
$219,175 est. value
Tacoma, WA

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

West Canal Polyurea
Alteration
Post-Bid
Quincy, WA 98848

Last Updated 03/29/2023 09:09 AM
Project Title

Morton Fueling Station Rebid

Physical Address View project details and contacts
City, State (County) Spokane, WA 99207   (Spokane County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $792,862 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 29, 2023, this project has not yet been awarded . A timeline for award has not yet been established. Public Utility District No. 1 of Lewis County (District) requires a vendor or contractor to provide labor, materials and equipment to install a vehicle fueling station at the DISTRICTs Morton location consisting of one permanent above ground tank supporting both diesel and unleaded fuel at 6,000- and 4,000-gallon capacity respectively for a total of 10,000 utilizing the FuelMaster system to manage the fueling operation specifications in accordance with the IFBs exhibits. Requests for Information: Email Marc Ripley at marcr@lcpud.org. Contractor shall provide labor, materials and equipment to install a vehicle Fueling Station at the DISTRICT'S Morton location consisting of one permanent above ground tank supporting both diesel and unleaded fuel at 6,000- and 4,000-gallon capacity respectively for a total of 10,000 utilizing the "FuelMaster" system to manage the fueling operation. Bids must be for the items and/or alternates as specified by the Contract Documents. No bid for less than one complete job item will be considered. Alternate bids not called for in the specifications will be considered at the discretion ofthe District. Question Deadline 11/14/2022 at 10:00 AM PT The District assumes no responsibility for any conclusions or interpretations made by a Bidder

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents