Similar Projects
Bristol Streambank Stabilization, EWP Site 5038-016
Infrastructure
Bidding
$280,000 to $310,000 est. value
Bristol, VT 05443

Floodplain Restoration Project Whetstone Brook at Melrose Terrace
Infrastructure
Bidding
West Brattleboro, VT 05301

Newbury Elementary School Drainage/ Grading Work and Concrete Wall Replacement
Post-Bid
Newbury, VT 05051

Shady Rill Recreation Area Streambank Restoration - Phase 3 Implementation
Post-Bid
Middlesex, VT

River Bank Retaining Wall Replacement
Results
$1,600,000 est. value
Springfield, VT

Rogers Road Culvert Replacement
Results
Westford, VT 05494

2020 Grants in Aid Project
Post-Bid
Norwich, VT 05055

2020 Maple Hill Road Culvert Replacement
Results
Barton, VT 05822

Garvin Hill Road and Grout Road Project
Infrastructure
Post-Bid
$25,000 est. value
Hartland, VT

Cady Road Culvert No. 2 Replacement Project
Results
$105,000 est. value
Middlebury, VT

Church and Park Street Culvert Replacement
Results
$780,000 est. value
Rutland, VT 05702

Thetford IM SCRP (22)
Term Contract
Results
$250,000 to $500,000 est. value
Thetford, VT 05074

Wheelerville Road Culvert 07-42 Replacement Project
Results
Mendon, VT 05701

Derry Woods Road Culvert Project
Results
$290,000 est. value
Londonderry, VT

Porter Road Culvert
Results
Cabot, VT 05647

Last Updated 07/29/2021 04:33 PM
Project Title

ANR-FPR Camel's Hump State Park Culvert Replacement

Physical Address View project details and contacts
City, State (County) Duxbury, VT   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing 48" diameter metal pipe culvert, replacement of existing culvert with 72" diameter x 55' long corrugated metal circular pipe culvert along a similar alignment as the existing culvert, and all associated roadway approach reconstruction and erosion control work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents