Similar Projects
Last Updated | 01/30/2020 02:26 PM |
Project Title | Camera Upgrade and Replacement at Highland Jr High, Mount Ogden Jr High and Hillcrest Elementary |
Physical Address | View project details and contacts |
City, State (County) | Ogden, UT 84401 (Weber County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cameras, Mounts, Labor and Material for a complete functional system as described. It may include installing camera mounts, cameras, cabling, conduit, surface molding, raceway, wire, faceplates, boxes, modular jacks, screws, patch cables, and labor related to the installation. The contractor providing the bid must perform the work and is not be subcontracted. 1. Installation of 26 data drops at the Highland Jr High, 21 data drops at Mount Ogden Jr High and 14 data drops at Hillcrest Elementary. A data drop consists of 2 separate data lines in each drop. Please reference materials provided at the mandatory pre-bid walk through meeting. 2. Boxes should be located inside the building for outside camera installations where possible. 3. Exact locations will be determined by the OSD Technology Department and provided to each Contractor. 4. Installation and setup of 38 cameras at the Highland Jr High, 38 cameras at Mount Ogden Jr High, and 14 cameras at Hillcrest Elementary. 5. 180, 2 meter category 6 patch cables in Forest Green color. 2 Cables per Camera. One patch cable on the camera end and one patch cable on the switch end. 6. Testing, documentation and warranty of the installed data cables and cameras is required. 7. OSD will provide all Power over Ethernet Switch Ports for the cameras. 8. OSD will provide all CAT 6 Patch Panels. 9. Configuration of the cameras to the appropriate server, the focusing, and direction of cameras will be done as joint effort of both OSD and the selected Contractor. 10. Each camera location will have a data drop that will consist of two data lines home run to nearest rack location. Please reference materials provided at the mandatory pre-bid walk through meeting. 11. Contractor will install, mount, and patch in all Cameras. Contractor will need to provide screws or means to secure the mount to the building. 12. Contractor will patch in camera to the switch port in accordance and with direction from OSD Technology Department. 13. Contractor will remove 22 old cameras at the Highland Jr High, 28 old cameras at Mount Ogden Jr High, and 5 cameras at Hillcrest Elementary according to reference materials provided at the mandatory pre-bid walk through meeting. Please note that some of these locations may be getting a new camera installed. Please keep old cameras on location in a box. 14. Contractor will patch, provide a faceplate, or value engineer a solution to make the old camera locations that are being removed but not replaced aesthetically pleasing. Please see reference materials provided at the mandatory pre-bid walk through meeting for approximate location. 15. Old analog wiring does not need to be removed but will need to be pulled back, tucked into ceiling, or some other method so that it is not visible and that the area can be repaired. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |