Similar Projects
RFP - Professional Services - Storm Water Utility Study
Term Contract
Conception
Springfield, GA 31329

RFP Engineering - New Sanitary Sewer Force Main
Infrastructure
Conception
$2,000,000 CJ est. value
Rincon, GA 31326

Six Building Facilities - Effingham County
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Springfield, GA 31329

SR 17 From SR 26 to S of CR 156 / Bluejay Road
Infrastructure
Design
$800,000 CJ est. value
Guyton, GA 31312

EMS and Public Works Facility Construction
New Construction, Infrastructure - 5,000 SF
Bidding
$4,000,000 CJ est. value
Guyton, GA 31312

2023 Springfield Street Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Springfield, GA 31329

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Guyton Road Improvements
Infrastructure
Results
Guyton, GA

4th Avenue LMIG
Infrastructure
Results
Guyton, GA 31312

RFP Design - Booster Pump Station
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Guyton, GA 31312

Georgia International Trade Center
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Guyton, GA 31312

O'Reilly Auto Parts (SFG) / Springfield
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Springfield, GA 31329

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Road Improvement Construction
Infrastructure
Results
$84,000 est. value
GA

Last Updated 05/15/2023 04:38 PM
Project Title

Blair Loop Drainage Improvements

Physical Address View project details and contacts
City, State (County) Guyton, GA 31312   (Effingham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $80,580 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Installing 316-LF of new 15" RCP along Blair Street with six (6) new storm structures connecting to an existing storm box. The project will also include two (2) open road cuts and repairs. Time allotted for completion of work is ninety (90) calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Funding is to be provided by the City of Guyton. Contractor shall comply with E-Verify regulations. Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents