Similar Projects
US 19 and Forest Oaks Boulevard Intersection Improvement
Infrastructure
Bidding
$284,900 est. value
Spring Hill, FL 34607

Inspection, Management, and Performance of Maintenance on All Components on and along Interstate Highway I-75 in Hillsborough, Pasco, and Hernando Counties
Post-Bid

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Solid Waste Facility Paving, Phase I and II
Results
Brooksville, FL 34601

Croom Road Resurfacing Project
Results
Less than $670,506 est. value
Brooksville, FL 34601

Asphalt Repair
Results
Less than $100,000 est. value

Asphalt Repairs
Results
Less than $250,000 est. value

Asphalt Repair Experience Form
Results
Less than $500,000 est. value

Olympia Road and Skyview Circle Resurfacing Project
Results
Less than $547,663 est. value
Brooksville, FL 34601

Pomp Parkway and Dusky Warbler Road Surface Treatment
Results
Less than $998,440 est. value
Brooksville, FL 34601

Emergency Roadside Assistance Service (ERAS)
Results
Less than $204,400 est. value

Shoal Line Boulevard Repaving, Phase I
Results
Less than $1,095,652 est. value
Weeki Wachee, FL 34607

Shoal Line Resurfacing Project, Phase II
Results
Less than $526,271 est. value
Weeki Wachee, FL 34607

Snow Hill Road and Jones Road Resurfacing Project
Results
Brooksville, FL 34601

Telcom Drive and Technology Drive Roadway Extension
Results
Less than $2,359,422 est. value
Brooksville, FL 34601

Last Updated 08/18/2021 04:43 PM
Project Title

Road Paving Projects 2021

Physical Address View project details and contacts
City, State (County) Brooksville, FL   (Hernando County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2021 Road Paving Projects, which includes twelve (12) pavement restoration projects divided into two (2) processes: Process A: Will consist of 4 road segments totaling 3721.6 square yards of roadway that will require complete reconstruction. Process B: Will consist of 8 road segments totaling 14,345 square yards of roadway that will be repaired through a typical mill and overlay process.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents