Skyline Water Tank Replacement Project
Infrastructure
Bidding
Millbrae, CA 94030

Reported 08/12/2021 12:00 AM
Project Title

USCG Novato Demolish Water Tower and Building 125 Pump House

Physical Address View project details and contacts
City, State (County) Novato, CA   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

WATER TOWER SCOPE OF WORK (BASE WORK): Provide all labor, materials, equipment, and supervision necessary to demolish the superstructure of the Water Tower and perform related utility and site work as indicated. The Contractor is responsible for all required permits, fees, and notifications. The water tower is approximately a 70’ tall and 30’in diameter metal structure, with associated abandoned water piping and a ladder leading to a rooftop with guardrails. The tower is located on a small hilltop above the Alta Vista portion of Novato Family Housing. There is a functional cell tower structure and new water piping in close vicinity which will need to be protected during demolition. See Appendix A, photo A. The work includes the following: 1. Remove and dispose of building demolition debris in accordance with Demolition Debris Management Plan, Asbestos Management Plan, and Lead-Based Paint Management Plan. 2. Demolish complete water tower which includes a full length metal ladder, roof guardrails and water pipes. The concrete pad will remain. For purpose of bidding only, see Appendix C for historical drawings of the tower. A sectional detail of the metal plate is provided. 3. The concrete base foundation will remain in place. 4. Protect the nearby cell tower and existing functional water piping. 5. Maintain existing fencing around the remaining functional pipes, verifying that the functional water pipes will be fully enclosed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents