Similar Projects
Reported | 07/30/2021 12:00 AM |
Project Title | Stormwater Pond 1 Diversion Project |
Physical Address | View project details and contacts |
City, State (County) | Martinsburg, WV (Berkeley County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is for construction of storm drainage improvements to convey flows from SWM Pond #1 of P&G Manufacturing Facility to Pikeside Channel via the BCDA property and Comet Lane. The work consists of approximately 650 LF of open channel grading, 400 LF of 4-each 30” RCP storm culverts, relocating 140 LF of 8” watermain and 412 LF of 2” water line, including but not limited to all clearing, grading and earthwork, asphalt paving, traffic control, and E&S Control measures. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |