Similar Projects
J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Rehabilitation of 6.0 MG Celestial Ground Storage Tank
Results
Dallas, TX

Upgrade 1000 Gallon Trinity Container
Results
San Antonio, TX

Ground Storage Tank Replacement
Post-Bid
TX

Water Supply and Storage Facility Expansion
Results
Katy, TX 77493

Replace Water Storage Tank with Feed Water System
Post-Bid
Brownwood, TX

Steven M. Clouse Water Recycling Center Underground Storage Tank Removal Project
Results
$134,700 est. value
San Antonio, TX 78275

Proposed Elevated Storage Tank
Infrastructure
Post-Bid
TX

2021 Water Plant Improvements
Infrastructure
Results
Spring, TX 77389

Corbett Ground Storage Tank
Infrastructure
Post-Bid
$300,000 est. value
Schertz, TX

Eagle Street Elevated Storage Tank Rehabilitation
Infrastructure
Results
$450,000 est. value
Weimar, TX

North Belton 1.0 MG Composite Elevated Water Storage Tank
Infrastructure
Results
$3,158,600 est. value
Belton, TX

0.5 Mg Apache Elevated Storage Tank Rehabilitation 51-06-22
Infrastructure
Results
$1,400,000 est. value
Temple, TX 76501

Reported 06/29/2022 03:29 PM
Project Title

SH 317 Ground Storage Tanks and Pump Station - City of Temple

Physical Address View project details and contacts
City, State (County) Temple, TX 76501   (Bell County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a civil project in Temple, Texas. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project. Design is underway for additional ground storage to be constructed along with the SH 317 Pump Station to provide for additional storage within the 835 pressure plane distribution system. The project is included in the city's 2022-2028 Capital Improvement Program (CIP). As of June 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents