Similar Projects
Last Updated | 11/04/2022 09:01 AM |
Project Title | North Base Complex, Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Norman, OK 73069 (Cleveland County) |
Category(s) | Commercial, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Car Wash, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,149,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Project includes, but is not limited to, construction of a new 4,730 SF structure for use as a transit and fleet vehicle wash facility. Sitework includes, but is not limited to, the following: clearing and grubbing, excavation, subgrade modification, trenching, site grading, building pad, paved drives, paved parking, pedestrian paving, utilities, site lighting, and storm drainage. Building construction includes, but is not limited to, the following: concrete foundations, termite pre-treatment, concrete floor slabs, tilt-up concrete walls, structural steel roof framing, metal deck, steel stairs and walkways, standing seam metal roofing, fiberglass doors and frames, sectional doors, door hardware, central vacuum system, vehicle washing systems, plumbing, unit heaters, lighting, electrical systems, access control, and fire alarm. Bidders attention is particularly called to the utilization of Federal Transit Administration (FTA) funding for this project. This Project will be subject to all applicable regulations from the granting agency including payment of not less than the prevailing hourly rate of wages as established by the Commissioner of Labor and by the Secretary of the U.S. Department of Labor or as determined by a court on appeal. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |