Similar Projects
Submersible Wastewater Pump - Pump Station 31 Greenwood
Infrastructure
Results
Topeka, KS 66614

Direct Replacement of Aurora Pumps at City Hall
Infrastructure
Post-Bid
Lawrence, KS

Prairie Trace Sanitary Sewer Improvements
Infrastructure
Bidding
Gardner, KS

Submersible Wastewater Pump - Pump Station 83 Washburn Rural
Infrastructure
Results
Topeka, KS 66630

Wilson Relief Well Project
Alteration
Design
KS

Kansas River Flood Protection Project Well 18 Abandonment
Infrastructure
Results
Manhattan, KS

Layne 10 Million Gallon Pump Rehabilitation
Infrastructure
Bidding
Topeka, KS

Water System Improvement
Infrastructure
Results
Nortonville, KS

Groundwater Monitoring Well Sampling for Wellfield
Infrastructure
Post-Bid
Wichita, KS

Reported 02/03/2022 12:00 AM
Project Title

Replacement of Sump Pump and Monitoring Systems

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the following: The elevator pit has a sump pump pit which contains two sump pumps and a monitoring system. This system and components were installed in 2002. The pumps have been replaced in the past. The monitoring system and alarm have not been replaced. At the current time the alarm system is not functional. This system allows the maintenance staff to respond quickly if pumps are failing. The elevator shaft is constructed with cinder blocks. The walls were sealed and waterproofing material installed on both the outside and inside of the shaft. Two weep holes with PVC piping were installed in the wall. Water runs into the pit from this area. It should be noted that the sump pump pit always contains water. It was determined during construction that the basement was installed over a water table. A drainage system was installed under the basement floor with a sump pump. The sump pumps and monitoring system will be replaced in the same footprint. The sump pump pit will not be altered.. All work will be located at Brown V Board of Education NHS in Topeka, KS

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents