Similar Projects
South Baker Intermediate School: Bus Loop
Infrastructure
Design
$140,000 CJ est. value
Baker City, OR 97814

South Baker Intermediate School: Bus Loop
Infrastructure
Design
$140,000 CJ est. value
Baker City, OR 97814

Jordan Valley/ Ontario/ Huntington/ Adrian Curb Ramps Project
Infrastructure
Bidding
$10,000,000 CJ est. value
Baker City, OR 97814

Jordan Valley/ Ontario/ Huntington/ Adrian Curb Ramps Project
Infrastructure
Bidding
$10,000,000 CJ est. value
Baker City, OR 97814

Haines Water Compliance Project - Phase 3
Infrastructure
Post-Bid
$280,000 est. value
Haines, OR

Central Building Abatement and Re-Roof
Term Contract, Renovation, Infrastructure - 18,322 SF
Post-Bid
$800,000 CJ est. value
Baker City, OR 97814

Water Treatment System Improvements - 2023
New Construction, Infrastructure - 1,000 SF
Results
$1,979,993 CJ est. value
Richland, OR 97870

Water Treatment System Improvements - 2023
New Construction, Infrastructure - 1,000 SF
Results
$1,979,993 CJ est. value
Richland, OR 97870

Ward Potato Storage Building
New Construction, Infrastructure
Pending Verification
$50,000 CJ est. value
Baker City, OR 97814

OR 86: Fish Creek
Infrastructure
Design
$2,176,207 CJ est. value
Baker City, OR 97814

Jordan Valley/Ontario/Huntington/Adrian Curb Ramps Project on Various Highways
Infrastructure
Bidding
$10,000,000 CJ est. value
Baker City, OR 97814

Baker Middle School Cafeteria/Multi-purpose Building, HVAC, and Safety/Security
Addition, Demolition, Renovation, Infrastructure - 6,030 SF
Post-Bid
$9,000,000 CJ est. value
Baker City, OR 97814

Farewell Bend Port of Entry Parking Lot Paving and Reinforced Concrete Repair
Infrastructure
Results
$895,301 CJ est. value
Huntington, OR 97907

US 30: (10th St) /Hughes- Cedar St upgrades (Baker)
Infrastructure
Design
$7,183,000 CJ est. value
Baker City, OR 97814

Water System Improvements
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Sumpter, OR 97877

Last Updated 04/17/2023 08:18 AM
Project Title

Wastewater Storage Lagoon - City of Baker City

Physical Address View project details and contacts
City, State (County) Baker City, OR 97814   (Baker County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected April 2020
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 30, 2019, the project is in early planning. Information regarding an architect and general contractor has not yet been disclosed. A timeline for construction has not been established at this point. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents