Similar Projects
Gretchen's House - Annexation and Renovation
Renovation - 1,865 SF
Conception
Ann Arbor, MI 48105

CGRESD, Administration Building Data Center Renovation
Post-Bid
Clare, MI

Sparta ECC Building Renovation
Renovation
Post-Bid
Sparta, MI

Peck Elementary School & Early Childhood Center
Results
Center Line, MI 48015

Lowell Area Schools - St. Mary`s Preschool
Results
Lowell, MI

415 Franklin Apartments
Renovation - 74,520 SF
Construction
$16,000,000 est. value
Grand Rapids, MI 49507

Early Childhood Education Center
New Construction - 28,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Detroit, MI 48221

Breton Wood Adult Care Facility Phase II
New Construction
Pending Verification
Kentwood, MI 49512

Holbrook Early Childhood Center Renovations
Renovation
Post-Bid
Grand Ledge, MI 48837

Early Childhood Education Center and Admin Offices
Results
Mattawan, MI

Everbrook Academy
New Construction - 12,870 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
South Lyon, MI 48178

BP 6 District Wide Renovations
Post-Bid
Brownstown, Gibraltar, Rockwood, Trenton, Woodhaven, MI 48173

Holbrook Early Childhood Center
Results
Grand Ledge, MI 48837

2018 Bond Program - New Childhood Center
Construction
Rochester, MI

Fulton Schools - Doors and Bathroom Remodels
Renovation
Post-Bid
Middleton, MI 48856

Last Updated 09/25/2020 09:29 AM
Project Title

CG Resd Data Center Renovation

Physical Address View project details and contacts
City, State (County) Clare, MI   (Clare County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Including, but not limited to: Renovation of the existing data room at the Administration building. Scope includes demolition/removal of the existing 8 ton data room AC unit, condenser, all associated ductwork in the attic space, and removal air outlets in the data room ceiling. New work includes installation of two new 6 ton upflow data room air conditioning units inside the existing data room and new ductwork distribution system in the attic. The data center must remain operational during construction. All data room IT equipment must be protected from demolition/construction procedures, and the data room must be cooled with temporary cooling equipment during demolition/construction.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents