Similar Projects
Chiller Maintenance Services
Infrastructure
Design
Detroit, MI 48201

HVAC Repairs and Maintenance
Term Contract
Sub-Bidding
Detroit, MI 48202

Elkay Filling Stations w/Single ADA Cooler
Renovation
Sub-Bidding
$400,000 CJ est. value
Garden City, MI 48135

HVAC Maintenance and Repair Service
Alteration
Post-Bid
Highland Park, Livonia, Taylor, Wayne, MI 48180

Air Filters for Powerhouse
Term Contract
Post-Bid
Dearborn, MI

CDBG Emergency Furnace Replacement
Results
Taylor, MI 48180

Heating and Cooling Services
Alteration
Results
River Rouge, MI 48218

A/C in the Middle School
Alteration
Post-Bid
Harper Woods, MI

Classroom Ceiling Fan Replacement Monteith Elementary School
Alteration
Results
Grosse Pointe Woods, MI 48236

FPM - Beecher House HVAC Improvements - 2021
Alteration
Post-Bid
Detroit, MI 48202

Chiller Compressor Replacement Grosse Point North High School
Alteration
Results
Grosse Pointe, MI

Mystic Creek Air Conditioning
Alteration
Post-Bid
Dearborn, MI

HVAC Revisions – Keidan Special Education Center, Burton Academy, and Davison Annex
Alteration
Results
Detroit, MI 48204

Emergency Restoration Services
Term Contract, Alteration
Post-Bid
MI

HVAC Revisions -Central High School and Moses Fields
Alteration
Results
Detroit, MI 48214

Last Updated 12/09/2022 05:08 AM
Project Title

Fieldhouse HVAC Retrofit

Physical Address View project details and contacts
City, State (County) Dearborn, MI 48126   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $163,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Advanced Technology Academy (hereinafter the "Academy" or "Owner") is seeking Bids from qualified contractors for the purpose of the retrofitting HVAC System in the Field House. The purpose of this Request For Bid (the "RFB") is to obtain Bids from experienced and qualified contractors to supply HVAC equipment, tools, supplies and supervisor and related Work for the retrofit of HVAC System as set forth in this RFB and the Contract (the "Work"). The Academy may select one or more experienced and qualified contractors to proceed with the negotiation process from those submitting Bids. The process will include the review and evaluation of methods and procedures used to provide effective excavation and landscaping services for the Academy within the scope of this RFB. Past experience will also be judged through the references of each entity. Each Bid must detail the contractor's experience and expertise in order to allow the Academy to properly and promptly evaluate each Bid, and the failure to do so may cause the Academy to reject said Bid. The Academy will select the Bid, if any, that it deems most qualified to serve the best interests of the Academy, in its sole and absolute discretion. The Academy, in its sole and absolute discretion, reserves the right to request post-Bid interviews from all, some or none of the entities submitting Bids. Generally, the Work consists of the following as set forth in APPENDIX A: 1. Prep site for HVAC equipment 2. Installing two 15 ton HVAC units 3. Provide gas piping to HVAC units 4. Provide Electric power to HVAC units 5. Provide and install Sheetmetal supply and return ducts 6. Provide and install BACnet enabled thermostats 7. Provide mechanical permits as required 8. Check tests start up units 9. Provide One Year Warranty on all parts and labor All Work must be done in accordance with all applicable law, rules, regulations, ordinances and Academy policies and be completed by 8/31/2023. Prospective Contractors may request that the Academy clarify information contained in this RFB, and may also request a site visit at the Academy. All such requests must be made in writing via email to squinlan@my.atafordpas.org All requests must be made prior to November 11, 2022. The Academy will provide a written response to all written Requests For Clarification within two (2) business days after the receipt of such request. The Academy will not respond to any Request For Clarification received after 12:00 p.m. on November 11, 2022. Requests For Clarification and inquiries for site visits must be made via e-mail and must be directed to Steve Quinlan at squinlan@my.atafordpas.org (Subject Line: HVAC Retrofit RFB Request for Clarification). No response will be made to any oral questions. The undersigned understands that the Academy reserves the right to accept or reject in whole or in part any and all Bids, to waive informalities and irregularities therein, and to award the Contract to other than the Contractor submitting the best financial Bid (low bidder) and to award the Contract to one (1) or more Contractors in the Academy's sole and absolute discretion.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents