Similar Projects
Replacing the Existing Orchestra Pit Covers at Both Neuqua Valley and Waubonsie Valley High Schools
Alteration
Bidding
$140,000 est. value
Aurora, IL

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Aluminum Window and Roofing - Summer 2021 Renovations
Post-Bid
Burlington, IL 60109

Replace Exterior Doors and Upgrade Security
Results
Less than $250,000 est. value
Elgin, IL 60123

Adventures Program Phase 2 - Bid Group 2
Renovation, Addition - 12,525 SF
Results
Aurora, IL 60505

Elevator Maintenance North Region
Term Contract
Post-Bid
Chicago, Dixon, Elgin, Ottawa, IL

Gymnasium Renovations - Phase Two
Renovation
Results
Less than $500,000 est. value
Elgin, IL 60120

Bay/Overhead Door
Term Contract
Post-Bid
Algonquin, IL

Lintel and Window Replacement
Results
Elgin, IL 60120

ADA Operators Additions at Multiple Campuses
Alteration
Post-Bid
Sugar Grove, IL 60554

2021 Summer Work at Batavia HS and Rotolo MS
Results
Batavia, IL 60510

2022 Summer School Improvements
Renovation
Post-Bid
Algonquin, Carpentersville, IL 60110

2021 Summer Renovations - Bid Release 3
Renovation
Results
Carpentersville, Hampshire, IL 60140

Cafeteria Expansions
Addition
Post-Bid
Elgin, IL 60124

Thompson Middle School and Wredling Middle School - Window Systems Shatter Resistant Flim
Results
Saint Charles, IL

Last Updated 05/04/2022 03:28 AM
Project Title

Kaneland Summer Work 2022

Physical Address View project details and contacts
City, State (County) Elburn, Maple Park, Sugar Grove, IL 60554   (Kane County)
Category(s) Education, Single Trades
Sub-Category(s) Conveying Systems, Finishes/Interior, Middle/Senior High School, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement interior and exterior hollow metal doors and frames, door hardware replacement, removal and replacement of exterior storefront entrance systems, removal and replacement of aluminum windows, installation of a new vertical platform lift and shaft enclosure at Harter Middle School.

Details

Middle/Senior High School, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Simulated Stone Fabrications, Solid Surfacing Fabrications.
Division 07 - Thermal and Moisture Protection, Thermal Insulation, Joint Sealants.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.
Division 14 - Conveying Equipment, Wheelchair Lifts, Platform Lifts.
Division 26 - Electrical, Commissioning of Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents