Similar Projects
Necedah - Babcock Constr / Pavement Replacement
Infrastructure
Conception
$5,000,000 CJ est. value
Pittsville, WI 54466

Necedah - Babcock Constr / Pavement Replacement
Infrastructure
Conception
$5,000,000 CJ est. value
Pittsville, WI 54466

Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

Babcock - Nekoosa, CTH G (N) - STH 73
Infrastructure
Post-Bid
$1,000,000 to $1,999,999 est. value
Babcock, Nekoosa, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Polymer Overlay
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Caribou Coffee -8th Street / Wisconsin Rapids
New Construction, Infrastructure - 300 SF
Pending Verification
$100,000 CJ est. value
Wisconsin Rapids, WI 54494

West 2nd Street Redevelopment
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Marshfield, WI 54449

C Wisconsin Rapids, Various Streets
Infrastructure
Post-Bid
$4,000,000 to $4,999,999 est. value
Pittsville, WI

Oak Street - Pavement Replacement
Infrastructure
Results
Wisconsin Rapids, WI 54494

Marshfield Armory Install Site Fencing - GPC
Infrastructure
Construction
$493,800 CJ est. value
Marshfield, WI 54449

Last Updated 03/31/2023 01:05 AM
Project Title

Street and Utility Reconstruction and Colored Concrete Crosswalk Replacement

Physical Address View project details and contacts
City, State (County) Marshfield, WI 54449   (Wood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $857,265 [brand] Estimate
Plans Available from Civil Engineer - 03/10/23
Owner View project details and contacts
Architect View project details and contacts
Description

Street/Road Intersection Construction and Repair, Sidewalks/Curbs/Gutters, Storm Drain and Paving, Utility Street Construction and Excavation, Sewer and Water Construction, Sitework/Excavating and Grading, Concrete Repair , Paving (Asphalt or Concrete) A. Arnold Street Reconstruction: Contract 2023-01 includes the reconstruction of W. Arnold Street, from St. Joseph Avenue to 700 west. The reconstruction of this existing street will include: partial replacement of the existing sanitary sewer mains, replacement of sanitary sewer laterals, replacement of the existing water mains and services, partial replacement of existing storm sewer, and installation of pipe underdrain; along with street improvements including fabric, Breaker-Run Stone subbase, crushed aggregate base course, concrete curb & gutter and driveway approaches, along with traffic control, erosion control, turf restoration (from back-of-curb to front-of-sidewalk), and pavement marking. This project does not include sidewalk repairs or replacements. Asphalt pavement will be done by others. Arnold Street will be closed for this reconstruction, however, pedestrian access must be maintained to residential properties at all times. B Central Avenue Colored Concrete Crosswalk Replacement (2nd Street to 17th Street): Select existing colored concrete crosswalks shall be replaced as indicated in the plans (spreadsheets) and per the discretion of the City Engineer. The amount of said crosswalk replacements that can be accomplished is limited by the budgeted funds for this project (cost of work to be completed cannot exceed budgeted amount). The scope of this project includes full-depth sawing, careful removal of existing colored concrete panels without impacting adjacent concrete surfaces/joints, drilling dowel and tie bars, re-pouring 9-inch colored concrete pavement, and traffic control. Central Avenue shall remain open however lane closures will be required Pre-Qualification: Yes Pre-Bid Meeting Info: None Anticipated Start of Construction: On or After May 15, 2023. Final Completion: On/before August 11, 2023 this project is valued about $800,000 PLAN NO. 3669, 3698

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents