Similar Projects
Bear Exhibit Redevelopment Project - Bid Package #2
Term Contract
Bidding
Toledo, OH 43609

Water Line to Well Nos. 8 and 9, Division B, 2021
Infrastructure
Bidding
$1,550,000 est. value
Defiance, OH

Pump Motor Replacement
Post-Bid
New Boston, OH 45662

PUB Water Treatment Plant Well Rehabilitation Project
Post-Bid
$597,200 est. value
Batavia, OH 45103

DM-2 Pump Replacement
Results
Less than $365,000 est. value
Dayton, OH

Secondary Pump Replacement Project
Results
Less than $427,000 est. value
Dayton, OH 45422

Sanitary Pump Replacement and Related Work at Maplewood Gardens
Infrastructure
Bidding
Cuyahoga Falls, OH 44224

Submersible Vertical Well Pump
Post-Bid
Dayton, OH

Building Sub Meter Installation
Results
Less than $72,019 est. value
Youngstown, OH

SD7 Influent Pump Station Improvement
Infrastructure
Bidding
$1,080,000 est. value
OH

Panel Assemblies for KI Miami North Wells
Post-Bid
Dayton, OH

Cleaning and Redevelopment of Wells #3 and #8
Results
Less than $68,956 est. value
Xenia, OH 45385

Water and Wastewater Step Pump and Filtered Pump Vault Purchase
Infrastructure
Bidding
OH

Richards Well Field Expansion Project
Post-Bid
Circleville, OH 43113

Greenfield Levee Pump/Motor #2 Repair
Results
Bainbridge, Greenfield, OH 45612

Last Updated 11/09/2021 04:44 PM
Project Title

New Well Nos. 8 and 9, Division A, 2021

Physical Address View project details and contacts
City, State (County) OH   (Defiance County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of construction of a new water supply Well Nos. 8 & 9. The work shall include drilling and installation of two 12-inch diameter well with a submersible pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents