Similar Projects
New Pro Star Rental Building
New Construction, Infrastructure - 11,422 SF
Design
$1,500,000 CJ est. value
Longview, TX 75604

New Pro Star Rental Building
New Construction, Infrastructure - 11,422 SF
Design
$1,500,000 CJ est. value
Longview, TX 75604

Work Packages Related to the New Kilgore High School
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Kilgore, TX 75662

Seal Coat
Infrastructure
Post-Bid
Hallsville, Marshall, TX 75672

North Marshall Industrial Avenue Reconstruction
Infrastructure
Post-Bid
Marshall, TX 75670

2021 Group Seal Coat Program
Results

2021 Group Seal Coat Program
Results

QuikTrip #7906 / Marshall
New Construction, Infrastructure - 8,292 SF
Construction
$1,000,000 CJ est. value
Marshall, TX 75672

QuikTrip #7906 / Marshall
New Construction, Infrastructure - 8,292 SF
Construction
$1,000,000 CJ est. value
Marshall, TX 75672

Southern Tire Mart / Longview
New Construction, Infrastructure - 48,130 SF
Pending Verification
$8,500,000 CJ est. value
Longview, TX 75604

Dutch Bros Coffee TX5104 / Longview
New Construction, Infrastructure - 950 SF
Pending Verification
$750,000 CJ est. value
Longview, TX 75604

American Cementing - Bulk Plant / Building Expansion
Addition, Demolition, Infrastructure - 9,375 SF
Design
$700,000 CJ est. value
Marshall, TX 75672

2021 HMAC Hot In-Place Recycling
Infrastructure
Post-Bid
Longview, TX

Fairmont Street Reconstruction Project
Results
$4,739,233 est. value
Longview, TX 75608

Longview Christian Church Addition and Remodel
Addition, Demolition, Renovation, Infrastructure - 12,000 SF
Construction
$1,500,000 CJ est. value
Longview, TX 75605

Last Updated 10/12/2022 11:38 PM
Project Title

Railroad Crossing Upgrades

Physical Address View project details and contacts
City, State (County) Longview, TX 75602   (Gregg County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Paving/Reconstruction, Railroad/Subway, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $309,960 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Ps&e Project Questions Call: Wendy Starkes 300 East Loop 390 N Marshall, Tx 75670 903/935-2809 Length: 0.10 Mi Time for Completion: 39 Working Days Limits From: Us 80 Limits to: 0.14 Mi S. Of Us 80 TXDOT - Railroad Crossing Upgrades

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents