Similar Projects
RTE 704 SWMB Repair
Bidding
Smithfield, VA 23430

Stormwater BMP Improvements
Bidding
Portsmouth, VA

Green Stormwater Infrastructure (Gsi)
Post-Bid
Charlottesville, VA

Stormwater Management Facility Construction
Post-Bid
Arlington, VA 22201

Hayfield Road Pipe Conveyance System Project
Results
$2,500,000 to $3,500,000 est. value
Franconia, VA

Trunk Storm Extension Phase 3&4
Results
Petersburg, VA

Grantwood Acres Sewer Pipeline Rehabilitation
Bidding
Spotsylvania, VA 22553

Basewide Storm Sewer Repair
Post-Bid
$10,000,000 to $25,000,000 est. value
Richmond, VA

Annual Services Contract 6 for Taps and Laterals Installation
Results
Virginia Beach, VA

CHS Sewer Line Repair
Bidding
Charlottesville, VA 22903

Edgewood Road to Wayside Place and Kenwood Lane Storm Upgrades
Post-Bid
Charlottesville, VA

12th Street CSO Separation
Results
Lynchburg, VA

Leigh Meadow Basin Retrofit And Stream Restoration
Bidding
Fairfax, VA 22035

Scope and Provide a Condition Report on the Sewer Lines
Post-Bid
Portsmouth, VA 23703

Stormwater Improvement Projects
Results
Richmond, VA

Reported 01/08/2019 03:28 PM
Project Title

Storm Sewer Basin

Physical Address View project details and contacts
City, State (County) Richmond, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Afton Storm Sewer Basin/Manhoie/Drain inlets S-1 - S-17 to be cleaned and free of debris. S-1 and S-13 should be priority. a) Remove existing storm sewer manhole lid/cover to gain access b) Remove existing debris within the basin/manhole using a vacuum truck c) Once debris is removed, the contractor shall with the assistance of a hydro jet attempt to flush the basin/manhole to ensure that the manhole is not clogged within the outfall. 1. If the manhole outfall appears to be clogged or centerline of flow obstructed; the contactor shall attempt to dislodge obstruction to re-establish the proposed flow. d) Re-install the existing storm sewer manhole/Drain inlet lid/cover
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents