Similar Projects
South College Avenue Stormwater Detention Facility Construction
Infrastructure
Conception
$417,000 est. value
Bryan, TX

Centennial Water Park Lift Station - WW2307 - City of Pearland
Renovation
Conception
$300,000 est. value
Pearland, TX 77584

Ground Water Facility/Re-Pump Station/HVAC and Ventilation System Improvements at Various Locations - Package 2
Renovation, Alteration
Design
Houston, TX

South Laredo Lift Station
New Construction
Bidding
$1,700,000 est. value
San Antonio, TX

Archeological Survey and Wetland Determination
New Construction
Bidding
$16,000,000 est. value
Coleman, TX

Reconstruction of Royal Oaks Lift Station
Post-Bid
Pearland, TX

WWTP Lift Station
New Construction
Post-Bid
TX 77356

West Portland Pump Station Improvements
Results
Portland, TX 78374

Existing Lift Station Nos. 2 and 3 Electrical Modifications, Generator, and Motor Control Center Replacement
Results
$300,000 est. value
Houston, TX 77040

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Village Creek Water Reclamation Facility South Flow Lift Station
New Construction
Construction
$19,993,000 est. value
Fort Worth, TX

Lift Stations 22 and 33 Expansion - WW2302 - City of Alvin
Renovation, Addition, Demolition
Conception
$1,027,000 est. value
Alvin, TX

Northwest Booster Pump Station
New Construction
Bidding
$1,400,000 est. value
Saginaw, TX

Sewer Lift Station Pump Replacements at the Ambrosio Guillen Texas State Veterans Home
New Construction
Post-Bid
$100,000 est. value
El Paso, TX 79924

Lift Station Control Panel Replacement Project
Results
Sugar Land, TX 77487

Last Updated 06/30/2022 12:24 AM
Project Title

Cobblestone Lift Station Abandonment

Physical Address View project details and contacts
City, State (County) Red Oak, TX 75154   (Ellis County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Red Oak is accepting Competitive Sealed Bids for furnishing all necessary materials, machinery, equipment, superintendence, and performing all work required for the Cobblestone Lift Station Abandonment Project. The project includes approximately 200 linear feet of 8" wastewater line, and the abandonment of the Cobblestone Lift Station as detailed in the Construction Plans and Specifications. The project is located in the City of Red Oak, Texas, at 201 Cobblestone Circle.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents