Similar Projects
CMTC Northern Training Area Crossing
Infrastructure
Bidding
$315,582 CJ est. value
Barling, AR 72916

CMTC Northern Training Area Crossing
Infrastructure
Bidding
$315,582 CJ est. value
Barling, AR 72916

Construction of CMTC Building 1589 Parking Lot Resurface at Fort Chaffee
Renovation
Post-Bid
Fort Smith, AR

High Performance Cold Mix
Infrastructure
Post-Bid

Barling and Hackett Overlay
Infrastructure
Results
Barling, Hackett, AR

Statewide CLRS Improvements
Infrastructure
Results

Barling Park Water Line Extension for Splash Pad and Fire Hydrant
Infrastructure
Bidding
$404,000 CJ est. value
Barling, AR 72923

Little Rock AR Station Employee Lot Improvements
Term Contract
Post-Bid

Milling for the Road Department
Infrastructure
Results
AR

2022 Lavaca Street Improvement
Infrastructure
Bidding
$400,000 CJ est. value
Lavaca, AR 72941

Barling and Hackett Overlay
Infrastructure
Results
Barling, Hackett, AR

Sebastian CO. Overlay No. 2
Infrastructure
Results
AR

Polymer Resin for Polymer Overlay
Term Contract
Results

2022 Sidewalk Program, Phase B
Infrastructure
Results
$290,000 est. value
Fort Smith, AR

Hwy. 64 - Hwy. 64 (Riverfront Dr.) (Fort Smith) (S)
Infrastructure
Results
$4,000,000 est. value
Barling, AR 72923

Last Updated 08/10/2022 04:33 PM
Project Title

Greenwood Highway 10S Sidewalks

Physical Address View project details and contacts
City, State (County) Greenwood, AR 72936   (Sebastian County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(TAP-18)(S) Bids shall be addressed "City of Greenwood, 30 Bell Road, Greenwood, AR 72936" and shall be labeled "Bid for Greenwood Highway 10S Sidewalks (TAP-18) (S), HWEI Project No. 2019042". Any bid received after the scheduled opening time will be returned unopened. This project includes the construction of approximately 5,931-linear feet of concrete sidewalk along Highway 10 South, in Greenwood, Arkansas. Bidders will be required to inform themselves of all Addenda duly issued in accordance with the requirements provided in the Instructions to Bidders. Information regarding the number of Addenda that have been duly issued can be obtained from Hawkins-Weir Engineers. The City of Greenwood, Arkansas, reserves the right to waive any informalities and reject any and all Bids. Bids shall remain firm for a period not to exceed 60 days from the Bid opening date. Each Bidder must deposit with their Bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. Bidders are advised that Buy America Provisions apply to this contract. The Arkansas Department of Transportation Standard Specifications for Highway Construction, latest edition, Section 106 contains the requirements and restrictions for Buy America. 23 CFR 635.410 contains all federal requirements for Buy America. This publication was paid for by the City of Greenwood, Arkansas, and the cost of the publication is $788.82, per Arkansas Code 14-55-208 and related statutes. The City of Greenwood notifies all bidders that this contract is subject to applicable labor laws, non-discrimination provisions, wage rate laws, and other federal laws including Fair Labor Standards Act of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents